GOLD FIELDS LA CIMA S.A: 66
Minerales
ADUANA | AÑO DUA | CANT. | UNIDAD MEDIDA | PRODUCTO | DESCRIPCIÓN | DESTINO | VALOR FOB $ |
---|---|---|---|---|---|---|---|
SALAVERRY | 2019 | 14,567,100 | KG | CONCENTRADO DE COBRE (CU); CONTRATO N2 - FECHA 10/10/2014 | OTROS ELEMENTOS PAGABLES: AU, AG. OTROS ELEMENTOS PENALIZABLES: AS. CU 21.37%(VOL.); AU 34.59 G/TM. (FIRE ASSAY); AG 38.58 G/TM. (AAS) ARSENICO 0.19% | GERMANY | 37,609,100 |
SALAVERRY | 2019 | 10,066,200 | KG | CONCENTRADO_DE_ CU:CONTRATO_N2; 10102014 | PAGABLES:AU;AG PENALIZABLES:AS CU 20.90%;AU 34.94 G/TM (FIRE ASSAY);AG 32.75 G/TM (AAS);AS0.27% (AAS);C.17.2.19;0502 2019: 10,800.57TMH;10,066. 18TMS;6. | GERMANY | 26,920,800 |
SALAVERRY | 2019 | 10,037,900 | KG | CONCENTRADO DE COBRE (CU); CONTRATO N2: 10102014 | OTROS ELEMENTOS PAGABLES: AU, AG. OTROS ELEMENTOS PENALIZABLES:AS CU21.59%(VOL);AU39.5 0G/TM. (FIRE ASSAY);AG38.50G/TM. (AAS);ARSENICO 0.083%(AAS);C.20 | GERMANY | 26,677,400 |
SALAVERRY | 2019 | 10,012,800 | KG | CONCENTRADO_DE_ COBRE_(CU),CONT RATO N2-10/10/2014 | OTROS ELEMENTOS PAGABLES: AU, AG. OTROS ELEMENTOS PENALIZABLES:AS CU21.24%(VOLUMETRIA) ;AU27.57G/TM.(FIREAS SAY-AAS);AG42.01G/TM .(AAS);ARSENICO0.355 %(AA | GERMANY | 25,345,300 |
SALAVERRY | 2019 | 10,014,700 | KG | CONCENTRADO_DE_ COBRE_(CU),CONT RATO N2-10/10/2014 | OTROS ELEMENTOS PAGABLES: AU, AG. OTROS ELEMENTOS PENALIZABLES:AS CU22.60%(VOLUMETRIA) ;AU38.67G/TM.(FA-AAS );AG42.46G/TM.(AAS); ARSENICO0.277%(AAS). ; C. | GERMANY | 26,986,300 |
SALAVERRY | 2019 | 10,191,100 | KG | CONCENTRADO_DE_ CU :CONTRATO TRAF-0415-001- FECHA 27.03.2015 | PAGABLES;AU;AG PENALIZABLES;AS CU 21.78%;AU35.00G/TM;A G39.90G/TM;AS 0.133%; C. 16.2.19; 21012019 ;20507828915 10,901.090TMH;10,191 .115TMS; 5.30%HUMEDA | FINLAND | 26,255,300 |
SALAVERRY | 2019 | 10,048,700 | KG | CONCENTRADO DE COBRE (CU); CONTRATO P2: 15042015 | OTROS ELEMENTOS PAGABLES: AU, AG. OTROS ELEMENTOS PENALIZABLES:AS CU20.58%(VOL);AU28.2 6G/TM. (FIRE ASSAY);AG36.13G/TM. (AAS);ARSENICO 0.35%(AAS);C.19. | JAPAN | 21,978,300 |
SALAVERRY | 2019 | 10,865,800 | KG | CONCENTRADO DE COBRE (CU); CONTRATO P2: 15042015 | OTROS ELEMENTOS PAGABLES: AU, AG. OTROS ELEMENTOS PENALIZABLES:AS CU21.72%(VOL.);AU32. 86G/TM.(FIRE ASSAY);AG46.88G/TM.( AAS);ARSENICO0.249%( AAS);C.22.2 | JAPAN | 27,915,400 |
SALAVERRY | 2019 | 9,930,030 | KG | CONCENTRADO_DE_ COBRE_(CU);CONT RATO_P2;1504201 5 | OTROS ELEMENTOS PAGABLES: AU, AG OTROS ELEMENTOS PENALIZABLES: AS CU21.37%(VOL.);AU30. 80G/TM.(FIREASSAY);A G32.28G/TM.(AAS);ARS ENICO0.347%(AAS).;C. 23.2 | JAPAN | 24,061,400 |
SALAVERRY | 2019 | 9,996,140 | KG | CONCENTRADO_DE_ COBRE_(CU),CONT RATO P2-15/04/2015 | OTROS ELEMENTOS PAGABLES: AU, AG. OTROS ELEMENTOS PENALIZABLES:AS CU21.52%(VOL.);AU33. 15G/TM.(FIRE ASSAY);AG36.33G/TM.( AAS);ARSENICO0.251%( AAS).;C.25 | JAPAN | 25,728,300 |
SALAVERRY | 2018 | 9,395,820 | KG | CONCENTRADO DE COBRE (CU); CONTRATO N2; 10/10/2014 | OTROS ELEMENTOS PAGABLES: AG, AU . OTROS ELEMENTOS PENALIZABLES: AS CU 20.469%; AU 28,181 G/TM, AG 35.929 G/TM., AS 0.016% 10,170.660 TMH / 9,395.82 T | BULGARIA | 22,351,900 |
SALAVERRY | 2018 | 4,926,710 | KG | CONCENTRADO_DE_ COBRE_(CU);_CON TRATO N.TRAF-0415-001 _FECHA:27.03.20 15 | OTROS_ELEMENTOS_PAGA BLES;AU;AG OTROS_ELEMENTOS_PENA LIZABLES;AS CU21.08%(VOL.);AU30. 89G/TM.(FIRE_ASSAY-A SS);AG33.26G/TM._(AA S);_ARSENICO_0.085%_ (AAS);_ | CHINA | 11,196,200 |
SALAVERRY | 2018 | 4,326,320 | KG | CONCENTRADO_DE_ COBRE_(CU);_CON TRATO_N.TRAF-04 15-001_FECHA:27 .03.2015 | OTROS ELEMENTOS_PAGABLES:A U;AG OTROS ELEMENTOS_PENALIZABL ES:AS CU21.25%(VOL);AU31.4 1_G/TM._(FIRE _ASSAY-AAS);_AG31.64 G/TM.(AAS);_ARSENICO _0.14%(AAS);_ | CHINA | 9,831,770 |
SALAVERRY | 2018 | 1,648,180 | KG | CONCENTRADO DE COBRE (CU),20.67% | 1782.68 TMH / 1640.23 TMS/ 7.99% HUMEDAD OTROS ELEMENTOS PAGABLES: AG 39.302 g/TM, AU 28.087 g/TM ELEMENTO PENALIZABLE: AS 0.050% | GERMANY | 4,108,170 |
SALAVERRY | 2018 | 955,100 | KG | CONCENTRADO DE COBRE (CU),19.79% | 1037.22 TMH / 950.49 TMS/ 8.36% HUMEDAD OTROS ELEMENTOS PAGABLES: AG 35.222 g/TM, AU 23.305 g/TM ELEMENTO PENALIZABLE: AS 0.111% | GERMANY | 2,380,630 |
SALAVERRY | 2018 | 10,001,300 | KG | CONCENTRADO DE COBRE (CU); CONTRATO N2; 10/10/2014 | OTROS ELEMENTOS PAGABLES: AU; AG. OTROS ELEMENTOS PENALIZABLES: AS CU 21.01%; AU 25.2 G/TM; AG 42.4 G/TM; AS 0.07% 10,716.340 TMH; 10,001.330 TMS; 5.9 | GERMANY | 20,220,100 |
SALAVERRY | 2018 | 10,079,800 | KG | CONCENTRADO DE COBRE (CU); CONTRATO N2; 10/10/2014 | OTROS ELEMENTOS PAGABLES: AU, AG. OTROS ELEMENTOS PENALIZABLES: AS. CU 20.45%; AU26 GR/TM.(FIRE BASS); AG 36.8 GR/TM. (ASS); AS 0.08%; 10,812.980 TMH | GERMANY | 21,236,200 |
SALAVERRY | 2018 | 10,473,700 | KG | CONCENTRADO_DE_ CU; CONTRATO N2-10/10/2014 | OTROS ELEMENTOS PAGABLES;AU;AG OTROS ELEMENTOS PENALIZABLES;AS CU21.83%;AU17.37G/TM (FIRE ASSAY-AAS);AG31.16G/ TM (AAS);ARSENICO 0.26%(AAS);C_9.2.18: 15 | GERMANY | 22,057,900 |
SALAVERRY | 2018 | 10,062,800 | KG | CONCENTRADO DE COBRE (CU); CONTRATO N2- FECHA: 10/10/2014 | OTROS ELEMENTOS PAGABLES;AU;AG OTROS ELEMENTOS PENALIZABLES;AS CU21.30%;AU 43.50G/TM.(FIRE ASSAY);AG35.72G/TM (AAS); ARSENICO 0.077%(AAS);C.13.2.1 8;26 | GERMANY | 26,135,200 |
SALAVERRY | 2018 | 5,413,720 | KG | CONCENTRADO DE COBRE (CU); CONTRATO N2-FECHA 10/10/2014 | OTROS ELEMENTOS PAGABLES: AU, AG OTROS ELEMENTOS PENALIZABLES: AS CU21.80%(VOL.);AU34. 52 G/TM.(FIRE ASSAY),AG39.29G/TM;( AAS);ARSENICO 0.24%(AAS);C.14. | GERMANY | 13,398,800 |
SALAVERRY | 2018 | 7,430,620 | KG | CONCENTRADO DE COBRE (CU),20.67% | 1,774.740 TMH. / 1,650.650 TMS.; 6.992% HUMEDAD OTROS ELEMENTOS PAGABLES: PLATA (AG) 39.302 GR/TM, ORO (AU) 28.087 GR/TM. ELEMENTO PENALIZABLE: ARSENI | GERMANY | 18,521,200 |
SALAVERRY | 2018 | 9,999,910 | KG | CONCENTRADO DE CU, P2, 15042015 | OTROS ELEMENTOS PAGABLES: AU; AG OTROS ELEMENTOS PENALIZABLES: AS CU 20.54%; AU 30.52G/TM; AG 30.10G/TM; AS 0.14%; 10,773.490 TMH; 9,990.91 TMS; 7.17% | JAPAN | 20,083,600 |
SALAVERRY | 2018 | 11,107,800 | KG | CONCENTRADO DE (CU); CONTRATO P2; 15/04/2015 | OTROS ELEMENTOS PAGABLES: AU, AG. OTROS ELEMENTOS PENALIZABLES: AS. CU 20.24 %; AU 23.3 GR/TM. (FIRE BAAS); AG 30.8 GR/TM. (AAS); AS 0.095% 11,910.880 | JAPAN | 22,834,300 |
SALAVERRY | 2018 | 4,994,210 | KG | CONCENTRADO_DE_ CU | PAGABLES;AU;AG PENALIZABLES;AS CU 20.902%;AU 31.11 GR/TM; AG39.4 G/TM;AS 0.105%;C_7.1.18;1207 18;20507828915 5,400.100 TMH;4,990.21TMS;6.87 %HUM;C_7.1.1 | JAPAN | 10,072,500 |
SALAVERRY | 2018 | 4,950,290 | KG | CONCENTRADO_DE_ CU | PAGABLES;AU;AG PENALIZABLES;AS CU21.78%;AU23.39G/TM ;AG31.48G/TM;AS 0.25%;C_8.1.18;12071 8;20507828915 5,352.62TMH;4,950.29 TMS;7.30%HUM;C_8.1.1 8;120718; | JAPAN | 9,993,950 |
SALAVERRY | 2018 | 12,004,100 | KG | CONCENTRADO_DE_ COBRE_(CU);_CON TRATO P2-15/04/2015 | OTROS ELEMENTOS PAGABLES;AU;AG OTROS ELEMENTOS PENALIZABLES;AS CU 21.05%(VOL.); AU 34.4 G/TM. (FIRE ASSAY-AAS); AG 32.3 G/TM. (AAS); ARSENICO 0.13% (A | JAPAN | 28,224,400 |
SALAVERRY | 2018 | 10,572,400 | KG | CONCENTRADO DE COBRE (CU); CONTRATO TRAF-1812-001-F ECHA 17/12/2018 | OTROS ELEMENTOS PAGABLES: AU, AG. OTROS ELEMENTOS PENALIZABLES: AS. CU 20.55%(VOL.); AU 35.04 G/TM. (FIRE ASSAY); AG 38.33 G/TM. (AAS); ARSENICO 0.17% | JAPAN | 27,884,200 |
AEREA Y POSTAL EX-IAAC | 2016 | 40 | KG | MUESTRAS DE RELAVE DE COBRE S/M S/M | 40 KILOS - 28 LITROS OFICIO No 00822-2016/DEPA/DIGE SA. PARA SU ANALISIS BIDONES CON RELAVE CONCENTRADO DE COBRE EN CERRO CORONA | CHILE | 20 |
SALAVERRY | 2015 | 9,979,360 | KG | CONCENTRADO DE COBRE A GRANEL | PORCENTAJE DE MINERAL CU% 20.386 -- AG(GR/MT) : 32.094 -- AU(GR/MT): 29.441 HUMEDAD 7.009% CONTENIDO NETO DE CU(KG): 2,034,391.72 -- AG(KG | GERMANY | 19,704,300 |
SALAVERRY | 2015 | 9,332,350 | KG | CONCENTRADO DE COBRE | PORCENTAJE DE MINERAL CU% 20.302 - AG(GR/MT): 33.576 - AU(GR/MT):35.879 HUMEDAD 7.249% CONTENIDO NETO DE CU(KG): 1,894,654.10 - AG(KG):313.34 - A | GERMANY | 19,543,300 |
SALAVERRY | 2015 | 10,298,600 | KG | CONCENTRADO DE COBRE | PORCENTAJE DE MINERAL CU% 20.657 -- AG(GR/MT): 33.460 -- AU(GR/MT):38.044 HUMEDAD: 6.621% CONTENIDO NETO DE CU%(KG):2,127,390.06 -- AG(KG): 344.59 | GERMANY | 22,438,800 |
SALAVERRY | 2015 | 10,043,600 | KG | CONCENTRADO DE COBRE | PORCENTAJE DE MINERAL CU% 20.080-AG(GR/MT):33. 090-AU(GR/MT):32.296 HUMEDAD: 6.571% CONTENIDO NETO DE CU(KG):2,016,756.89- AG(KG): 332.34-AU(KG):324.37 | GERMANY | 19,532,200 |
SALAVERRY | 2015 | 10,053,700 | KG | CONCENTRADO DE COBRE | PORCENTAJE DE MINERAL CU%: 21.568 - AG(GR/MT): 32.451 - AU(GR/MT): 38.507 HUMEDAD: 6.698% - CONTENIDO NETO CU(KG): 2,168,390.64 - AG(KG): 326.25 - AU( | SPAIN | 22,671,400 |
SALAVERRY | 2015 | 10,030,100 | KG | CONCENTRADO DE COBRE | A GRANEL | JAPAN | 21,604,700 |
SALAVERRY | 2015 | 9,280,550 | KG | CONCENTRADO DE COBRE | A GRANEL | JAPAN | 20,460,300 |
SALAVERRY | 2015 | 5,744,790 | KG | CONCENTRADO DE COBRE | PORCENTAJE DE MINERAL CU%21.176 - AG(GR7MT): 34.992 - AU (GR/MT): 27.813 HUMEDAD: 7.277% CONTENIDO NETO DE CU(KG): 1,216,516.10 - AG(KG):201.02 - | JAPAN | 10,254,300 |
SALAVERRY | 2015 | 3,164,770 | KG | CONCENTRADO DE COBRE | A GRANEL HUMEDAD 6.940%, COMPOSICION: CU: 21.131%, AG: 29.179GR/TM, AU: 39.303GR/TM CONTENIDO FINO: CU: 668,746.12KG, AG: 92.35KG, AU: 124.39K | JAPAN | 7,187,020 |
SALAVERRY | 2015 | 1,834,530 | KG | CONCENTRADO DE COBRE | A GRANEL HUMEDAD 6.940%, COMPOSICION: CU: 21.245%, AG: 29.466 GR/MT, AU: 45.819 GR/MT CONTENIDO FINO: CU: 389,749.11 KG, AG: 54.06 KG, AU: | JAPAN | 4,167,040 |
SALAVERRY | 2015 | 9,833,030 | KG | CONCENTRADO DE COBRE | PORCENTAJE DE MINERAL CU% 21.298 - AG(GR/MT): 33.483 - AU (GR/MT): 35.971 HUMEDAD: 7.079% CONTENIDO NETO DE CU(KG): 2,094,238.94 - AG(KG): 329.24 - AU | JAPAN | 20,994,200 |
SALAVERRY | 2015 | 4,854,490 | KG | CONCENTRADO DE COBRE | A GRANEL HUMEDAD 6.94%, COMPOSICION: CU: 20.786%, AG: 32.772GR/MT, AU: 36.538GR/TM CONTENIDO FINO CU: 1,009,054.71KG, AG: 159.09KG, AU: 177.37KG VAL | JAPAN | 11,023,100 |
SALAVERRY | 2015 | 9,769,280 | KG | CONCENTRADO DE COBRE | PROCENTAJE DE MINERAL CU% 21.401 - AG(GR/MT): 33.715 - AU(GR/MT): 36.093 HUMEDAD: 7.020% - CONTENIDO NETO DE CU(KG): 2,090,723.61 - AG(KG): 329.37 - C | JAPAN | 20,905,800 |
SALAVERRY | 2015 | 9,991,800 | KG | CONCENTRADO DE COBRE A GRANEL | PORCENTAJE DE MINERAL CU% 20.191 - AG(GR/MT): 32.161 - AU(GR/MT): 36.708 HUMEDAD: 7.495% CONTENIDO NETO DE CU(KG): 2,017,444.94 - AG(KG): 321.35 - AU( | KOREA, REPUBLIC OF | 21,538,700 |
SALAVERRY | 2015 | 8,627,490 | KG | CONCENTRADO DE COBRE | PORCENTAJE DE MINERAL CU% 20.670 - AG(GR/MT): 31.215 - AU(GR/MT): 40.418 HUMEDAD: 6.927% CONTENIDO NETO DE CU(KG): 1,783,301.98 -- AG (KG):269.31 -- | KOREA, REPUBLIC OF | 18,784,600 |
SALAVERRY | 2015 | 10,314,000 | KG | CONCENTRADO DE COBRE | PORCENTAJE DE MINERAL CU% 21.588 - AG(GR/MT): 33.583 - AU(GR/MT): 38.996 HUMEDAD: 7.058% CONTENIDO NETO DE CU(KG): 2,226,597.11 -- AG(KG): 346.3 | KOREA, REPUBLIC OF | 22,042,300 |
SALAVERRY | 2015 | 5,115,470 | KG | CONCENTRADO DE COBRE | PORCENTAJE MINERAL CU: 19.877 - AG: 31.563 - AU: 33.292 HUMEDAD: 6.761% - CONTENIDO NETO CU: 1,016,801.97 - AG: 161.46 - AU: 170.30 VALOR COMERCIAL: C | SWEDEN | 9,143,470 |
SALAVERRY | 2015 | 594,050 | KG | CONCENTRADO DE COBRE | PORCENTAJE MINERAL CU: 20.035 - AG: 28.463 - AU: 34.523 HUMEDAD: 6.761% - CONTENIDO NETO CU: 119,017.92 - AG: 16.91 - AU: 20.51 VALOR COMERCIAL CU: $0 | SWEDEN | 1,061,820 |