| MARITIMA DEL CALLAO | 2024 | 12.205 | KG | RODILLO ESTRANGULAMIENTO D60X679 EJE M10 N600, LECON, 60X679 RODILLO ESTRANGULAMIENTO D60X679 EJE M10 N600 RODILLO ESTRANGULAMIENTO D60X679 EJE M10 N600 3040500153 4052313 | ITALY | ITALY | 397.67 |
| MARITIMA DEL CALLAO | 2024 | 10.244 | KG | RODILLO TRANSPORTADOR, S/M, S/M RODILLO TRANSPORTADOR RODILLO TRANSPORTADOR 4052156 | ITALY | ITALY | 227.71 |
| MARITIMA DEL CALLAO | 2024 | 3.688 | KG | ROD TRANSP, S/M, S/M ROD TRANSP ROD TRANSP 4052253 | ITALY | ITALY | 81.98 |
| MARITIMA DEL CALLAO | 2024 | 2066 | KG | GRUPO DE MOLIENDA MRV160 NO RODILLO 2013, LB, LB GRUPO DE MOLIENDA MRV160 NO RODILLO 2013 GRUPO DE MOLIENDA MRV160 NO RODILLO 2013 X01000275176 4054357,CREDITO 60 DIAS DE EMISION DE FC | ITALY | ITALY | 57460.2 |
| MARITIMA DEL CALLAO | 2024 | 3 | U | VASTAGO CEMENTADO CROMADO 8X24,5, S/M, S/M VASTAGO CEMENTADO CROMADO 8X24,5 4049568 REPUESTOS PARA INDUSTRIA CERAMICA | ITALY | ITALY | 11.99 |
| MARITIMA DEL CALLAO | 2024 | 1 | U | EJE, GRUPPO TECNOFERRARI S.P.A., ALBERO SOLLEVAMENTO EJE ACERO D505212282 4113044 | ITALY | ITALY | 1077.5 |
| MARITIMA DEL CALLAO | 2024 | 1 | U | EJE REDUCTOR TAMIZ 1300 POS.5, S/M, S/M EJE REDUCTOR TAMIZ 1300 POS.5 EJE REDUCTOR TAMIZ 1300 POS.5 3040010487 4052172 | ITALY | ITALY | 70.65 |
| AEREA Y POSTAL EX-IAAC | 2024 | 2 | U | MANCAL FC 206., SERVITECH, FC206 MANCAL FC 206. MANCAL FC 206. 101045 4102657 | CHINA | BRAZIL | 44.1 |
| MARITIMA DEL CALLAO | 2024 | 1 | U | SEPARADOR D=20 DO=15,5 L=12, S/M, S/M SEPARADOR D=20 DO=15,5 L=12 4048485 REPUESTOS PARA INDUSTRIA CERAMICA | ITALY | ITALY | 4.44 |
| MARITIMA DEL CALLAO | 2024 | 191 | U | COJINETE, BEARINGS, CUSCINETTO COJINETE ACERO RK-240-13-0030 4048688 | ITALY | ITALY | 478.61 |
| MARITIMA DEL CALLAO | 2024 | 25 | U | COJINETE, KSB, CUSCINETTO Ø45XØ10 SP. 12MM RIVESTITO COJINETE 4049989 COJINETE 4049989,CREDITO A 120 DIAS FECHA FACTURA | ITALY | ITALY | 313.16 |
| MARITIMA DEL CALLAO | 2024 | 2 | U | COJINETE, KSF, CUSCINETTO 22222 C SKF COJINETE ACERO 01087017 4103142,CREDITO 120 DIAS DESDE FECHA FACTURA | MALAYSIA | ITALY | 734.98 |