| AEREA Y POSTAL EX-IAAC | 2025 | 1.189 | KG | ALAMBRE DE ACERO PARA ASEGURAR MONTAJE D, HUAWEI, steelwire-430mm STEEL WIRE ALAMBRE DE ACERO PARA ASEGURAR MONTAJE DE EQUIPOS PL: 0TH6042506000AIRD0040K PART NUMBER: 21154869,CREDITO A 180 DIAS DESDE FECHA DE FACTURA | CHINA | PANAMA | 102 |
| MARITIMA DEL CALLAO | 2025 | 0.026 | KG | ARANDELAS DE SEGURIDAD, HUAWEI, M4X14-SUS-ZNAL NON-STANDARD FASTENER,DKBA6.860.4400,HEXAGON SOCKET CAP HEAD SPRING LOCK WASHER AND PLAIN ARANDELAS DE SEGURIDAD 0TH6042507002JIRD0013H 26020227 | CHINA | PANAMA | 0.7 |
| AEREA Y POSTAL EX-IAAC | 2025 | 0.002 | KG | PIN METALICO DE EXTRACCIÓN, PARA TERMINAL HUAWEI MODELO ICL-LX9 (ACCESORIO), S/M, S/M SMALL METAL PARTS,DKBA80214734,NORMALIZATION SIM CARD EJECTION PIN,HIMA-AL00B, SHEETMETAL, PIN METALICO DE EXTRACCIÓN, PARA TERMINAL HUAWEI MODELO ICL-LX9 (ACCESO | CHINA | HONG KONG | 0.4 |
| AEREA Y POSTAL EX-IAAC | 2025 | 0.001 | KG | PIN METALICO DE EXTRACCIÓN, S/M, S/M NORMALIZATION SIM CARD EJECTION PIN, PIN METALICO DE EXTRACCIÓN 00060425A007GMCHN06K 51629745 | CHINA | MACAO | 0.02 |
| AEREA Y POSTAL EX-IAAC | 2025 | 0.019 | U | ALAMBRE DE ACERO PARA ASEGURAR MONTAJE DE EQUIPOS, HUAWEI, STEELWIRE-430MM STEEL WIRE ALAMBRE DE ACERO PARA ASEGURAR MONTAJE DE EQUIPOS 000604250901TGIRD0018H 21154869 | CHINA | PANAMA | 3.14 |
| AEREA Y POSTAL EX-IAAC | 2024 | 0.235 | KG | SOPORTE METALICO PARA INSTALAR EQUIPO, HUAWEI, B-3DT-INAP01 BRACKET ACCESSORY SOPORTE METALICO PARA INSTALAR EQUIPO P/L: 0Y06042400310JIHD0001K PART NUMBER: 21244035 | CHINA | PANAMA | 14.69 |
| AEREA Y POSTAL EX-IAAC | 2024 | 0.046 | KG | SOPORTE METALICO, HUAWEI, B-3DT-INAP01 BRACKET ACCESSORY SOPORTE METALICO PARA INSTALAR EQUIPO P/L: 000604240909TDIHD0001H PART NUMBER: 21244035 | CHINA | PANAMA | 4.46 |
| MARITIMA DEL CALLAO | 2024 | 0.205 | KG | ACCESORIO METALICO PARA FIJACION DE TERMINALES ELECTRICOS, HUAWEI, DKBA04800538 DKBA0.480.0538,TERMINAL FIXTURE,E/UK1 0Y06042400140BIHD0001H 21100087 | CHINA | PANAMA | 5.26 |
| MARITIMA DEL CALLAO | 2024 | 0.77 | KG | SOPORTE METALICO, HUAWEI, E0UTFMK01 SOPORTE METALICO PARA FIJACION DE GABINETE UPPER FIXING BRACKET COMPONENT 0006042311130DIHM0002H 21150715 | CHINA | MEXICO | 43.36 |
| MARITIMA DEL CALLAO | 2024 | 21.492 | KG | CUBIERTA DE LLUVIA, GUANGZHOU RAILWAY, FUSIONDC1000-SP-001 CUBIERTA DE LLUVIA PARA PUERTA (DE METAL) SLEET COVER FOR DOOR 0Y06042300370UDPA0006H 21260521 | CHINA | CHINA | 512.32 |
| MARITIMA DEL CALLAO | 2024 | 1042.21 | KG | ESTRUCTURA DE SOPORTE PARA INSTALACION DE EQUIPOS, HUAWEI, ESUPPORTS35 STANDARD A-SHAPED HIGH BRACKET 3.0 ESTRUCTURA DE SOPORTE PARA INSTALACION DE EQUIPOS PL: 0006042402100GDPA0018H PART NUMBER: 21540480 | CHINA | CHINA | 20927 |
| MARITIMA DEL CALLAO | 2024 | 0.158 | KG | ALAMBRE DE ACERO PARA ASEGURAR MONTAJE DE EQUIPOS, HUAWEI, STEELWIRE-430MM STEEL WIRE ALAMBRE DE ACERO PARA ASEGURAR MONTAJE DE EQUIPOS PL: 000604231128TGIHD0002H PART NUMBER: 21154869 | CHINA | PANAMA | 16.51 |