| AEREA Y POSTAL EX-IAAC | 2025 | 6 | U | UNIDAD DE DISTRIBUCION DE ENERGIA, HUAWEI, CR5M0DPUDC00 DC POWER DISTRIBUTION UNIT UNIDAD DE DISTRIBUCION DE ENERGIA PL N° 0TH6042412001LIHM0006H 02120724,PAGO AL CREDITO A 180 DIAS DE LA FECHA DE FACTURA | CHINA | MEXICO | 445.93 |
| AEREA Y POSTAL EX-IAAC | 2025 | 1 | U | CHASIS DE EQUIPO RTN 950, HUAWEI, SL9K2URACK01 RTN 950 ASSEMBLY CHASSIS(-48V) CHASIS DE EQUIPO RTN 950 00P6042502088PIHO0001K PART NUMBER: 02113174,180 DIAS DE CRED DESDE FECHA DE FC | CHINA | CHINA | 274.73 |
| MARITIMA DEL CALLAO | 2025 | 1 | U | GABINETE INTEGRADO DE METAL PARA ALBERGAR EQUIPOS, HUAWEI, NV1BA6TCDC01 DC BASIC CONFIGURATION CABINET(DEFAULT (5+5)*100A,DC -48V INPUT) 0006042501120HIHD0016H 02353MMT | CHINA | PANAMA | 3899.37 |
| MARITIMA DEL CALLAO | 2025 | 2 | U | SUB RACK INTEGRADO DE UNIDAD DE BANDA BASE BBU5900 (CONTIENE VENTILADORES Y CONEXIONES INT BBU5900 BOX 0006042412330GIHD0010H 02311VFF | CHINA | PANAMA | 795.48 |
| AEREA Y POSTAL EX-IAAC | 2025 | 15 | U | CHASIS INTEGRADO PARA ROUTER NETENGINE 8000 M8, HUAWEI, CR8BM8BKPDC1 NETENGINE 8000 M8 INTEGRATED DC CHASSIS COMPONENTS(INCLUDING 2*DC POWER,FAN BOX) CHASIS INTEGRADO PARA ROUTER NETENGINE 8000 M8 (CONTIENE 2 FUENTES DE ENERGIA Y 1 VENTILAD PL N° 0TH | CHINA | MEXICO | 10740.8 |
| MARITIMA DEL CALLAO | 2025 | 1 | U | GABINETE INTEGRADO PARA EQUIPO DE RED, HUAWEI, QM1K00PBCS00 UNIFIED BUSSINESS ARCHITECTURE BASE SHELF(PARCB) GABINETE INTEGRADO PARA EQUIPO DE RED (CONTIENE TARJETAS, VENTILADORES, CABLES Y ACCESORIO PL N° 0006042410450GHWA0006H 02300708,PAGO AL CRED | CHINA | CHINA | 2297.76 |
| MARITIMA DEL CALLAO | 2025 | 8 | U | GABINETE INTEGRADO DE ENERGÍA, HUAWEI, MTS9604B-N20C1 INDOOR POWER, MTS9604B, THREE-PHASE, 400A, 600MM(W)*600MM(D)*2000MM(H) GABINETE INTEGRADO DE ENERGÍA PL: 00060424122442IFK0053H PART NUMBER: 01075336-001 | CHINA | PANAMA | 11743.1 |
| AEREA Y POSTAL EX-IAAC | 2025 | 1 | U | MÓDULO DE GESTIÓN DE BATERÍA INTELIGENTE DE EQUIPO UPS, HUAWEI, SMARTLI-BMM INTELLIGENT BATTERY MANAGEMENT MODULE MÓDULO DE GESTIÓN DE BATERÍA INTELIGENTE DE EQUIPO UPS 00P6042502128JHWZ0001K PART NUMBER: 02313PYT-001,180 DIAS DE CRED DESDE FECHA DE | CHINA | CHINA | 2117.62 |
| MARITIMA DEL CALLAO | 2025 | 199 | U | UNIDAD DE DISTRIBUCIÓN DE CORRIENTE CONTINUA, HUAWEI, DCDU17E DC POWER DISTRIBUTION UNIT DCDU17E UNIDAD DE DISTRIBUCIÓN DE CORRIENTE CONTINUA PL: 0TH6042411002BIHD0053H PART NUMBER: 02123490,CREDITO A 180 DIAS DE FECHA DE FACTURA | CHINA | PANAMA | 20714.3 |
| MARITIMA DEL CALLAO | 2025 | 1 | U | GABINETE INTEGRADO DE METAL PARA ALBERGAR EQUIPOS, HUAWEI, NV1BA6TCDC01 DC BASIC CONFIGURATION CABINET(DEFAULT (5+5)*100A,DC -48V INPUT) GABINETE INTEGRADO DE METAL PARA ALBERGAR EQUIPOS ( CONTIENE RIELES, CABLES DE ENERGIA Y U PL N° 0006042501120HIH | CHINA | ECUADOR | 3899.37 |
| MARITIMA DEL CALLAO | 2025 | 1 | U | UNIDAD DE DISTRIBUCION DE ENERGIA, HUAWEI, DCDU-12B DC POWER DISTRIBUTION UNIT UNIDAD DE DISTRIBUCION DE ENERGIA PL N° 0TH6042409000XIHD0017H 02120731,PAGO AL CREDITO A 180 DIAS DE LA FECHA DE FACTURA | CHINA | ECUADOR | 75.83 |
| MARITIMA DEL CALLAO | 2025 | 2 | U | UNIDAD DE DISTRIBUCION DE ENERGIA, HUAWEI, DCDU-12B DC POWER DISTRIBUTION UNIT UNIDAD DE DISTRIBUCION DE ENERGIA PL: 0TH6042409000XIHD0009H PART NUMBER: 02120731 | CHINA | ECUADOR | 151.67 |