| PAITA | 2024 | 22800 | KG | TUBERIA DE PERFORACION, HE XIN OIL, S-135 DRILL PIPE 2 7/8", 10.40 LB/FT, CONNECTION: NC-26 TOOL JOINT (P:9" X B:10"): OD: 3 3/8" A 3 5/8", ID: 1 3/4", BODY:OD: 2 7/8", ID:2 1/8" (2. PARA PERFORACION DE POZO ACERO,PAGO A CREDITO: 75 DIAS DESDE LA EMI | CHINA | CHINA | 52695 |
| AEREA Y POSTAL EX-IAAC | 2024 | 3.945 | KG | EMPAQUETADURA ESPIRAL, ARIEL, A-10411 GASKET,SPIRAL WOUND,11 OD EMPAQUETADURA ESPIRAL REPUESTOS PARA COMPRESOR DE GAS NATURAL METAL | UNITED STATES | UNITED STATES | 1885.21 |
| AEREA Y POSTAL EX-IAAC | 2024 | 0.106 | KG | EMPAQUETADURA, ARIEL, A-1884 STL GASKET,14.563 X 14.250 X60 EMPAQUETADURA REPUESTOS PARA COMPRESOR DE GAS NATURAL ACERO | UNITED STATES | UNITED STATES | 50.57 |
| AEREA Y POSTAL EX-IAAC | 2024 | 0.383 | KG | EMPAQUETADURA, ARIEL, A-1889 STL GASKET, 6.986 X 6.783 X30 EMPAQUETADURA REPUESTOS PARA COMPRESOR DE GAS NATURAL ACERO | UNITED STATES | UNITED STATES | 183.07 |
| AEREA Y POSTAL EX-IAAC | 2024 | 0.082 | KG | SEGURO, ARIEL, A-1462 LOCKNUT, DRAKE,3/4-16 SEGURO REPUESTOS PARA COMPRESOR DE GAS NATURAL ACERO,CREDITO 15 DIAS | UNITED STATES | ARGENTINA | 29.03 |
| AEREA Y POSTAL EX-IAAC | 2024 | 0.361 | KG | BRIDA 3", ARIEL, A-3183 GSKT,PIPE FLG,3"-300#,1/8 BRIDA 3 REPUESTOS PARA COMPRESOR DE GAS NATURAL ACERO | UNITED STATES | UNITED STATES | 172.39 |
| PAITA | 2024 | 48975.6 | KG | TUBERIA SIN COSTURA DE 2-7/8", XINXING, 2-7/8" J55 TUBING 2-7/8" J55, 6.5 LBS/FT 8RD, EUE R2 GRADO J 55, PESO 6.5 LBS/PIE, 8 HILOS, CONECCIÓN EUE, GRADO 2 MATERIAL PARA PRODUCCION DE POZOS DE PETROLEO ACERO,PAGO A CREDITO: 75 DIAS DESDE LA EMISION DE | CHINA | PANAMA | 52111.2 |
| PAITA | 2024 | 5655 | KG | COLLAR DE PERFORACION, HE XIN OIL, 4145 H DRILL COLLAR DE 3 1/2", SUPERFICIE LISA, OD:3 1/2 ID:1 1/2", 4145 H, 26#/FT, CONN: 2 3/8 IF (NC-26) X 30 PIES PARA PERFORACION DE POZO ACERO,PAGO A CREDITO: 75 DIAS DESDE LA EMISION DE LA FACTURA | CHINA | CHINA | 16455 |
| PAITA | 2024 | 9328.12 | KG | TUBERIA, XINXING, 2-7/8" J55 TUBING 2-7/8" J55, 6.5 LBS/FT, 8RD, EUE R2 GRADO J 55, PESO 6.5 LBS/PIE, 8 HILOS, CONECCIÓN EUE, GRADO 2 MATERIAL PARA PRODUCCION DE POZOS DE PETROLEO ACERO,PAGO A CREDITO: 75 DIAS DESDE LA EMISION DE LA FACTURA | CHINA | CHINA | 10088.8 |
| AEREA Y POSTAL EX-IAAC | 2024 | 0.038 | KG | EMPAQUETADURA DE ACERO, ARIEL, A-0141 STL GASKET, 4.328 X 4.125 X 30 EMPAQUETADURA DE ACERO REPUESTOS PARA COMPRESOR DE GAS NATURAL ACERO,CREDITO 15 DIAS | UNITED STATES | ARGENTINA | 13.59 |
| AEREA Y POSTAL EX-IAAC | 2024 | 0.229 | KG | EMPAQUETADURA, ARIEL, A-2126 STL GASKET, 4.861 X 4.543 X 30 EMPAQUETADURA REPUESTOS PARA COMPRESOR DE GAS NATURAL ACERO | UNITED STATES | UNITED STATES | 109.61 |
| AEREA Y POSTAL EX-IAAC | 2024 | 0.065 | KG | EMPAQUETADURA, ARIEL, A-2064 STL GASKET, 8.500 X 9.125 X 60 EMPAQUETADURA REPUESTOS PARA COMPRESOR DE GAS NATURAL ACERO | UNITED STATES | UNITED STATES | 30.91 |