| SALAVERRY | 2025 | 455.834 | KG | TUBERÍA CON BRIDA DE 12", BW WATER AMERICAS, S/M RO FRAMES - EAST / PARA LOS BASTIDORES DE RECIPIENTES Y DE VÁLVULAS DE LA ESTRUCTURA MODU ACERO INOXIDABLE // (16045-308803-S3EB04-12") N/S 4 INCLUYE: PERNO - 1-1/8" CON 2 TUERCAS PARA PLANTA DE TRATA | MALAYSIA | MALAYSIA | 12006.5 |
| CHANCAY | 2025 | 472 | KG | CONJUNTO DE ACCESORIOS Y ACOPL, S/M, S/M 16045-UF-30003-BOX // UF MODULE PIPING HARDWARE & COUPLINGS - TRAIN 3 - EAST DE ACERO INOXIDABLE // FABRICADO SEGUN PLANOS DE INGENIERIA CONJUNTO DE ACCESORIOS Y ACOPLAMIENTOS PARA TUBERIA PARA LA LINEA 3 DEL | CHINA | CHINA | 160284 |
| CHANCAY | 2025 | 2325.3 | KG | CONJUNTO DE ACCESORIOS Y ACOPL, BW WATER, S/M CONJUNTO DE ACCESORIOS Y ACOPLAMIENTOS PARA TUBERIA PARA LA LINEA 2 DEL PROCESO DE ULTRAFI ACERO INOXIDABLE // UF MODULE PIPING HARDWARE & COUPLING - TRAIN 2 WEST PARA PLANTA DE TRATAMIENTO DE AGUA POR UL | CHINA | CHINA | 158056 |
| CHANCAY | 2025 | 362.264 | KG | CONJUNTO DE ACCESORIOS Y ACOPLAMIENTOS, BW WATER, S/M CONJUNTO DE ACCESORIOS Y ACOPLAMIENTOS PARA TUBERÍA PARA LA LÍNEA 4 DEL PROCESO DE ULTRAFI ACERO INOXIDABLE / CPVC / PVC // FABRICADO SEGUN PLANOS DE INGENIERIA PARA PLANTA DE TRATAMIENTO DE AGUA | CHINA | CHINA | 158051 |
| CHANCAY | 2025 | 362.264 | KG | CONJUNTO DE ACCESORIOS Y ACOPLAMIENTOS, BW WATER, S/M CONJUNTO DE ACCESORIOS Y ACOPLAMIENTOS PARA TUBERÍA PARA LA LÍNEA 7 DEL PROCESO DE ULTRAFI ACERO INOXIDABLE / CPVC / PVC // FABRICADO SEGUN PLANOS DE INGENIERIA PARA PLANTA DE TRATAMIENTO DE AGUA | CHINA | CHINA | 158051 |
| SALAVERRY | 2025 | 185.392 | KG | BRIDA DE RESPALDO, IPP, BUP-SDR11-34B BRIDA DE RESPALDO DE HIERRO DUCTIL // FLANGE RESPALDO HIERRO DUCTIL DR11 DN 34 IPS REVEST DUCTILE IRON A536 // HIERRO COMPONENTE PARA CONEXION DE TUBERIAS PARA PLANTA DE TRATAMIENTO DE AGUA | CHINA | UNITED STATES | 4934.38 |
| MARITIMA DEL CALLAO | 2025 | 0.79 | KG | ACOPLE DE 90 GRADOS, TM ENGINEERING LTD, S/M QUICK DISCONNECT 90 DEGREE FITTING ACOPLE DE 90 GRADOS DESCONEXIÓN RÁPIDA DE METAL PARA ACOPLARSE AL ORIFICIO DE ENGRASE PARA LUBRICAR LA MÁQUINA PART NUMBER: JC240A | CANADA | UNITED STATES | 765.04 |
| AEREA Y POSTAL EX-IAAC | 2025 | 12.552 | KG | ACOPLAMIENTO 4, VICTAULIC, STYLE 905 ACOPLAMIENTO DE 4 PULGADAS PARA TUBERÍA DE POLIETILENO DE EXTREMO LISO (STYLE 905), JUNTA DUCTIL IRON A536 / HIERRO DUCTIL A536 COMPUESTO DE HIERRO 86%, CARBON 3.50%, SILICON 2.20% UNE TUBERÍAS DE POLIETILENO DE E | UNITED STATES | UNITED STATES | 198.13 |
| AEREA Y POSTAL EX-IAAC | 2025 | 30.105 | KG | ACOPLAMIENTO 6, VICTAULIC, STYLE 905 ACOPLAMIENTO DE 6 PULGADAS PARA TUBERÍA DE POLIETILENO DE EXTREMO LISO (STYLE 905), JUNTA DUCTIL IRON A536 / HIERRO DUCTIL A536 COMPUESTO DE HIERRO 86%, CARBON 3.50%, SILICON 2.20% UNE TUBERÍAS DE POLIETILENO DE E | UNITED STATES | UNITED STATES | 475.22 |
| CHANCAY | 2025 | 6518 | KG | CONJUNTO PREFABRICADO DE TUBER, S/M, S/M 16045-UF-30003 // UF MODULE PIPING SPOOLS TRAIN 3 - EAST DE ACERO INOXIDABLE // FABRICADO SEGUN PLANOS DE INGENIERIA CONJUNTO PREFABRICADO DE TUBERIAS CON ACOPLAMIENTOS PARA LA LINEA 3 DEL PROCESO DE ULTRAFI P | CHINA | CHINA | 320568 |
| CHANCAY | 2025 | 7300 | KG | CONJUNTO PREFABRICADO DE TUBER, S/M, S/M 16045-UF-30001 // UF MODULE PIPING SPOOLS TRAIN 1 - EAST DE ACERO INOXIDABLE // FABRICADO SEGUN PLANOS DE INGENIERIA CONJUNTO PREFABRICADO DE TUBERIAS CON ACOPLAMIENTOS PARA LA LINEA 1 DEL PROCESO DE ULTRAFI P | CHINA | CHINA | 320567 |
| CHANCAY | 2025 | 7000 | KG | CONJUNTO PREFABRICADO DE TUBER, S/M, S/M 16045-UF-30002 // UF MODULE PIPING SPOOLS TRAIN 2 - EAST DE ACERO INOXIDABLE // FABRICADO SEGUN PLANOS DE INGENIERIA CONJUNTO PREFABRICADO DE TUBERIAS CON ACOPLAMIENTOS PARA LA LINEA 2 DEL PROCESO DE ULTRAFI P | CHINA | CHINA | 320567 |