| MARITIMA DEL CALLAO | 2024 | 934.8 | KG | M-I-X II MEDIUM, S/M, S/M M-I-X II MEDIUM - BG,25 LB P/N: M0002155; SAP BATCH: 0065458317 ADITIVO DE FLUIDO DE PERFORACION DE POZOS DE PETROLEO, | UNITED STATES | UNITED STATES | 1653.62 |
| MARITIMA DEL CALLAO | 2024 | 5000 | KG | FLO-VIS PLUS, S/M, S/M FLO-VIS PLUS - BG,25 KG P/N: M0005460; SAP BATCH: 0065132586 ADITIVO PARA FLUIDO DE PERFORACION PETROLER DPU=DAT 2020; PAGO A CREDITO - 180 DIAS DESDE LA FECHA DE POSTEO 30/10/2024 | CHINA | NETHERLANDS | 46587.7 |
| TUMBES | 2024 | 721 | KG | D182, MUDPUSH II SPACER, S/M, S/M D182, MUDPUSH II SPACER P/N: D182 PARA USO EN LA INDUSTRIA PETROLERA PAGO A 180 DIAS A PARTIR DE LA FECHA DE FACTURA | CHINA | ECUADOR | 12675.8 |
| TUMBES | 2024 | 3000 | KG | DUO-VIS - BG,25 KG, S/M, S/M DUO-VIS - BG,25 KG P/N: M0002944 PARA LA INDUSTRIA PETROLERA Plazo: 30 dias | CHINA | ECUADOR | 44403.6 |
| MARITIMA DEL CALLAO | 2024 | 4906.75 | KG | FLO-VIS PLUS, S/M, S/M FLO-VIS PLUS - BG,25 KG P/N: M0005460; SAP BATCH: 0064608988 ADITIVO PARA FLUIDO DE PERFORACION PETROLER PAGO A CREDITO - 180 DIAS DESDE LA FECHA DE POSTEO 09/04/2024 - VENCIMIENTO: 06/10/2024 | CHINA | CHINA | 45603.6 |
| MARITIMA DEL CALLAO | 2024 | 4906.75 | KG | FLO-VIS PLUS, S/M, S/M FLO-VIS PLUS - BG,25 KG P/N: M0005460; SAP BATCH: 0064608989 ADITIVO PARA FLUIDO DE PERFORACION PETROLER | CHINA | CHINA | 45603.6 |
| TUMBES | 2024 | 6000 | KG | FLO-VIS PLUS - BG,25 KG, S/M, S/M FLO-VIS PLUS - BG,25 KG P/N: M0005460 PARA USO EN LA INDUSTRIA PETROLERA | CHINA | ECUADOR | 177250 |
| TUMBES | 2024 | 0.013 | KG | PIPE: PVC SCH 40/80 1/4 IN OR METRIC EQ, S/M, S/M PIPE: PVC SCH 40/80 1/4 IN OR METRIC EQ PART NUMBER: 100056941 PARA USO EN LA INDUSTRIA PETROLERA PLAZO: 180 DÍAS | UNITED STATES | COLOMBIA | 2.42 |
| TUMBES | 2024 | 0.02 | KG | TUBO DE PLASTICO, S/M, S/M TUBING: -PFA, 0.418+.003 -.003 ID X 0.0 P/N: 0871376 PARA USO EN LA INDUSTRIA PETROLERA PLAZO: 180 DÍAS DESDE LA FECHA DE FACTURA | CHINA | ECUADOR | 16.72 |
| TUMBES | 2024 | 0.005 | KG | TUBING: FEP HEAT SHRINK, #1 AWG x 100FT, S/M, S/M TUBING: FEP HEAT SHRINK, #1 AWG x 100FT P/N: 100142626 PARA USO EN LA INDUSTRIA PETROLERA | UNITED STATES | ECUADOR | 14.31 |
| AEREA Y POSTAL EX-IAAC | 2024 | 0.06 | KG | TUBO TERMO RETRACTIL TRANSPARENTE, S/M, S/M TUBING, 5/16 DIA, SHRINKABLE (4:1) TEFL P/N: K-160974 SE LE APLICA CALOR SE ADAPTA A LA FORMA DEL CABLE QUE PASARA DENTRO DE ESTE Y LA FUNCION D PLASTICO POLITETRAFLUOROETILENO,PAGO A CREDITO PLAZO 180 DIAS | UNITED STATES | ECUADOR | 5.44 |
| AEREA Y POSTAL EX-IAAC | 2024 | 0.006 | KG | TUBO PROTECTOR, S/M, S/M TUBING, 5/64 DIA, SHRINKABLE (4:1) TEFL P/N: K-160970 REPUESTO PARA USO EN LA IND. PETROLERA TEFLON,PAGO A CREDITO: 180 DIAS CONTABILIZADO A PARTIR DE SU FECHA DE POSTEO EN SAP: 22/10 | UNITED STATES | COLOMBIA | 12.86 |