| MARITIMA DEL CALLAO | 2024 | 0.118 | KG | ANILLO, S/M, S/M RING: VALVE ACTUATOR, MTR 562, MAXIMUS P/N: 100257042 DE USO EN LA IND PETROLERA | SINGAPORE | COLOMBIA | 40.27 |
| TUMBES | 2024 | 0.005 | KG | LAINA DE AJUSTE, S/M, S/M SHIM: PMP SFT SETTING, .005 .87 302SS P/N: 7019599 PARA USO EN LA INDUSTRIA PETROLERA PAGO A 180 DIAS DE LA FECHA DE FACTURA | SINGAPORE | ECUADOR | 8.34 |
| TUMBES | 2024 | 0.006 | KG | ANILLO DE COMPRESION, S/M, S/M RING, COMPRESSION: 540 MTR, PLUG-IN, TI P/N: 7026164 PARA LA INDUSTRIA PETROLERA PLAZO: 180 DÍAS DESDE LA FECHA DE FACTURA | SINGAPORE | ECUADOR | 8.58 |
| AEREA Y POSTAL EX-IAAC | 2024 | 1.923 | KG | ANILLO DE SUSPENCION, S/M, S/M HANGER CLAMP RING PD475 2 STAGE P/N: 100313869 PARA EQUIPO DE CALIBRACION DAT=DPU 2020, PAGO CREDITO 180 DIAS CONTAB PARTIR DE FECHA DE POSTEO EN SAP: 11-12-24 | UNITED STATES | UNITED STATES | 353.04 |
| AEREA Y POSTAL EX-IAAC | 2024 | 0.002 | KG | ANILLO RETENEDOR, S/M, S/M RETAINING RING,INTERNAL FOR 1.456 ID SST P/N: B033453 PARA USO EN LA INDUSTRIA PETROLERA DAT=DPU 2020, PAGO CREDITO 180 DIAS CONYAB. PARTIR DE FECHA DE POSTEO EN SAP: 13-12-24 | UNITED STATES | UNITED STATES | 5.92 |
| AEREA Y POSTAL EX-IAAC | 2024 | 1.923 | KG | ANILLO DE SUSPENCION, S/M, S/M HANGER CLAMP RING PD475 2 STAGE P/N: 100313869 PARA EQUIPO DE CALIBRACION DAT=DPU 2020, PAGO CREDITO 180 DIAS CONTAB PARTIR DE FECHA DE POSTEO EN SAP: 11-12-24 | UNITED STATES | UNITED STATES | 353.04 |
| AEREA Y POSTAL EX-IAAC | 2024 | 0.093 | KG | ANILLO RETENEDOR, S/M, S/M O-RING:RETAINING;INTL,8340 LB,HVY,1.75 P/N: B033455 PARA USO EN LA INDUSTRIA PETROLERA PAGO A CREDITO: 180 DIAS CONTABILIZADO A PARTIR DE SU FECHA DE POSTEO EN SAP: 22/10/24 | UNITED STATES | COLOMBIA | 76.12 |
| TUMBES | 2024 | 0.01 | KG | ANILLO RETENEDOR, S/M, S/M RING: RETAINING, 1.37 SFT, EXT LIGHT DU P/N: 100118913 PARA USO EN LA INDUSTRIA PETROLERA PLAZO: 180 DÍAS DESDE LA FECHA DE FACTURA | UNITED STATES | ECUADOR | 5.18 |
| AEREA Y POSTAL EX-IAAC | 2024 | 0.019 | KG | ANILLO, S/M, S/M RING, SNAP: 5100-118, MONEL K-500, 1.18 P/N: 0299065 PARA USO EN LA INDUSTRIA PETROLERA PAGO A CREDITO: 180 DIAS CONTABILIZADO A PARTIR DE SU FECHA DE POSTEO EN SAP: 26/8/24 | UNITED STATES | UNITED STATES | 22.92 |
| TUMBES | 2024 | 0.015 | KG | ANILLOS, S/M, S/M RING, SNAP: 2" EXTERNAL STEEL IRR #3100 P/N: 7004435 PARA USO EN LA INDUSTRIA PETROLERA PAGO A 180 DIAS DE LA FECHA DE FACTURA | UNITED STATES | ECUADOR | 32.89 |
| TUMBES | 2024 | 0.01 | KG | LAINA, S/M, S/M SHIM: SFT PMP 862, .03, 1.19, SS P/N: 1153485 PARA USO EN LA INDUSTRIA PETROLERA PAGO A 180 DIAS DE LA FECHA DE FACTURA | UNITED STATES | ECUADOR | 9.96 |
| AEREA Y POSTAL EX-IAAC | 2024 | 0.057 | KG | ANILLO EXTERNO, S/M, S/M RING, SNAP:1-3/8 EXTERNAL, HD, STL, TRU P/N: 100318770 PARA MOTOR ELECTROSUMERGIBLE PAGO A CREDITO: 180 DIAS CONTABILIZADO A PARTIR DE SU FECHA DE POSTEO EN SAP: 21/08/24 | UNITED STATES | ECUADOR | 8.7 |