83

SCHLUMBERGER DEL PERU S.A EN LA PARTIDA CANDADOS, CERRADURAS, GUARNICIONES, CAJAS DE SEGURIDAD, CAMPANAS, TUBOS, TAPAS, ALAMBRES Y MATERIAL METÁLICO DE SOLDADURA: 124 TOTAL REGISTROS

FILTROS



ADUANA AÑO DUA CANT. UNIDAD MEDIDA PRODUCTO ORIGEN PROCEDENCIA VALOR FOB $
AEREA Y POSTAL EX-IAAC 2024 8.02 KG TAPON ROSCADO DE PRESION, S/M, S/M PRESSURE PLUG, 1/8" NPT FLUSH TYPE, TEFLON COATED P/N: B032678 PARA USO EN LA INDUSTRIA PETROLERA DAT=DPU 2020, PAGO CREDITO 180 DIAS CONTAB. A PARTIR DE FECHA DE POSTEO EN SAP: 26-11-24 UNITED STATES UNITED STATES 147.36
AEREA Y POSTAL EX-IAAC 2024 0.023 KG TAPON, S/M, S/M PIPE PLUG, 1/8-27, PTF, TAPER 7/8in, BRASS, P/N: M-000213 PARA USO EN TUBERIA DE USO EN LA INDUSTRIA PETROLERA DAT=DPU 2020, PAGO CREDITO 180 DIAS CONYAB. PARTIR DE FECHA DE POSTEO EN SAP: 22-11-24 UNITED STATES UNITED STATES 4.69
AEREA Y POSTAL EX-IAAC 2024 0.075 KG TAPON ROSCADO, S/M, S/M PLUG: VALVE, MTR, 456 DOMINATOR, UT/CT P/N: 1346618 PARA MOTOR ELECTROSUMERGIBLE UNITED STATES COLOMBIA 15.82
TUMBES 2024 0.01 KG TAPON ROSCADO, S/M, S/M PLUG: VALVE, MTR, 456 DOMINATOR, UT/CT P/N: 1346618 PARA USO EN LA INDUSTRIA PETROLERA PLAZO: 180 DÍAS DESDE LA FECHA DE FACTURA UNITED STATES ECUADOR 1.1
AEREA Y POSTAL EX-IAAC 2024 0.973 KG TAPON SST ¼ - 24 CON ARO DE RESPALDO Y SELLO , S/M, S/M PLUG, SST, 1/4-28 BACK-UP AND O-RING P/N: H701640 INSTALAN EN LA HERRAMIENTA LEH-QT PARA EVITAR QUE LA SUCIEDAD EXTERIOR INGRESE DENTRO DE L ACERO INOXIDABLE UNITED STATES UNITED STATES 164.63
TUMBES 2024 1 U NAMEPLATE: PUMP, BLANK, S/M, S/M NAMEPLATE: PUMP, BLANK P/N: 0073684 PARA LA INDUSTRIA PETROLERA PLAZO: 180 DÍAS DESDE LA FECHA DE FACTURA UNITED ARAB EMIRATES ECUADOR 4.61
AEREA Y POSTAL EX-IAAC 2024 2 U PLACA DE IDENTIFICACION, S/M, S/M NAMEPLATE: PUMP, BLANK P/N: 0073684 PARA BOMBA ELECTROSUMERGIBLES PAGO A CREDITO: 180 DIAS CONTABILIZADO A PARTIR DE SU FECHA DE POSTEO EN SAP: 26/8/24 SINGAPORE UNITED STATES 9.6
TUMBES 2024 1 U PLACA DEIDENTIFICACION, S/M, S/M NAMEPLATE: REDA MAXIMUS, BLANK P/N: 100136929 PARA USO EN LA INDUSTRIA PETROLERA PAGO A 180 DIAS DE LA FECHA DE FACTURA SINGAPORE COLOMBIA 17.4
TUMBES 2024 2 U NAMEPLATE: PROTECTOR, BLANK, S/M, S/M NAMEPLATE: PROTECTOR, BLANK P/N: 0073700 PARA LA INDUSTRIA PETROLERA PAGO A 30 DIAS SINGAPORE ECUADOR 7.33
AEREA Y POSTAL EX-IAAC 2024 3 U PASADOR DE BISAGRA, S/M, S/M HINGE PIN, ENHANCED, ORBIT 475 P/N: 101245621 PARA USO EN LA INDUSTRIA PETROLERA PAGO A CREDITO 180 DIAS CONTABILIZADO A PARTIR DE LA FECHA DE SU POSTEO EN SAP:24-05-24 CHINA UNITED STATES 376.21
AEREA Y POSTAL EX-IAAC 2024 0.765 KG TAPA, SELLO FRONTAL ASENTAMIENTO, S/M, S/M COVER, FACE SEAL SEAT, IMPULSE NO-GAP MODULATOR P/N: S-285974 SOPORTA EL LIQUEO O FUGAS DE ACEITE EN EL EXTREMO DEL IPTA ACERO,DAT=DPU 2020, PAGO CREDITO:180 DIAS CONTAB.PARTIR DE FECHA DE POSTEO EN SAP: 07/ CHINA UNITED STATES 386.48
AEREA Y POSTAL EX-IAAC 2024 0.018 KG TAPON ROSCADO, S/M, S/M PLUG: SOCKET HEAD PIPE, .125 PIPE THD P/N: 1061258 PARA USO EN LA IND. PETROLERA PAGO A CREDITO: 180 DIAS CONTABILIZADO A PARTIR DE SU FECHA DE POSTEO EN SAP: 21/08/24 SINGAPORE ECUADOR 2.8