| AEREA Y POSTAL EX-IAAC | 2025 | 2 | U | MODULO DE MOTOR DC, KASEUM, 000837 3.600" K-SET MOTOR MODULE (25 RUNS) P/N: 104402859 QUE PERMITE LA ROTACION DE LA HERRAMIENTA POR MEDIO DE UN MOTOR DC DE BAJO TORQUE Y BAJO V INCONEL/ALUMINIO | UNITED KINGDOM | NETHERLANDS | 3643.08 |
| TUMBES | 2025 | 3 | U | MOTOR ELECTROSUMERGIBLE, SLB, RA-S-RLOY-AS MOTOR: 562, #10, F102, MAXIMUS, RA-S, R P/N: 100373064 / PO: 4584539954 - 21652604 USADO PARA LA EXTRACCION DE PETROLEO DESDE EL FONDO DEL POZO, POTENCIA: 375 HP SERIAL NUMBER: 1004918954,CREDITO: 180 DIAS, | SINGAPORE | ECUADOR | 45592 |
| AEREA Y POSTAL EX-IAAC | 2025 | 3 | U | DIVISOR INTERNO, S/M, S/M RUNNER: MTR 540, WB 1.37 P/N: 0386185 PARA MOTOR ELECTRICO DE USO EN LA IND. PETROELRA PAGO A CREDITO: PLAZO 180 DIAS CONTAB A PARTIR DE LA FECHA DE POSTEO EN SAP: 15-04-25 | UNITED ARAB EMIRATES | COLOMBIA | 129.83 |
| TUMBES | 2025 | 4 | U | BRIDA, SLB, S/M CAP: GRB, 738 MAXIMUS, RLOY P/N: 101333073 PARTE DE SISTEMAS DE BOMBA ELECTROSUMERGIBLE SERIAL NUMBER: N/A,CREDITO: 180 DIAS, CONTABILIZADOS A PARTIR DE SU FECHA DE POSTEO EN SAP | CHINA | ECUADOR | 457.01 |
| TUMBES | 2025 | 2 | U | TAPA COMPENSACION, S/M, CAP GRB 738 MAXIMUS CAP: GRB, 738 MAXIMUS, RLOY P/N: 101333073 PARA USO EN LA INDUSTRIA PETROLERA S/N: NA ,PLAZO DE 180 DIAS, CONTABILIZADOS A PARTIR DE SU FECHA DE POSTEO EN SAP 18/OCT | CHINA | ECUADOR | 221.55 |
| TUMBES | 2025 | 10 | U | ROTOR, S/M, S/M ROTOR: MTR S/A 562 22 SLOT, BRADDED, RO P/N:1071455 PARA BOMBA SUMERGIBLE USADA EN LA INDUSTRIA PETROLERA CREDITO 180 DIAS, A PARTIR DE SU FECHA DE POSTEO EN SAP: 13/09 | CHINA | ECUADOR | 3352.01 |
| AEREA Y POSTAL EX-IAAC | 2025 | 2 | U | ANILLO DE 2 PIEZAS, S/M, S/M RING: TWO PC, PROT 540 MON, 1.18 P/N: 0912550 PARA MOTOR ELECTROSUMERGIBLES PAGO A CREDITO 180 DIAS CONTAB. A PARTIR DE FECHA DE POSTEO EN SAP: 16-062025 | CHINA | UNITED STATES | 53.1 |
| TUMBES | 2025 | 2 | U | ESTATOR BOBINADO, SLB, 562 STATOR, WOUND: 562, RA WC:F122, AMW, 12 P/N: 100211276 PARA USO EN LA INDUSTRIA PETROLERA S/N: NH9NI509040, UPK3A-336229,CREDITO: 180 DIAS, CONTABILIZADOS A PARTIR DE SU FECHA DE P | INDONESIA | ECUADOR | 13899.7 |
| TUMBES | 2025 | 2 | U | ESTATOR BOBINADO, S/M, S/M STATOR, WOUND: 562, RA WC:F122, AMW, 12 P/N: 100211276 PARA USO EN LA INDUSTRIA PETROLERA PO: 4584464115-21627243,CREDITO 180 DIAS, A PARTIR DE SU FECHA DE POSTEO EN SAP 01 OCTUBR | INDONESIA | ECUADOR | 13878.8 |
| AEREA Y POSTAL EX-IAAC | 2025 | 2 | U | ZAPATA DE EMPUJE, S/M, S/M RUNNER: MTR 540, WB 1.37 P/N: 0386185 PARA USO EN LA INDUSTRIA PETROLERA | MALAYSIA | ECUADOR | 92.04 |
| TUMBES | 2025 | 2 | U | ZAPATA DE EMPUJE, S/M, S/M RUNNER: MTR 540, WB 1.37 P/N: 0386185 PARA USO EN LA INDUSTRIA PETROLERA PO: 4584448585 - 21622196,CREDITO 180 DIAS, A PARTIR DE SU FECHA DE POSTEO EN SAP: 01 OCTU | MALAYSIA | ECUADOR | 92.12 |
| TUMBES | 2025 | 2 | U | CABEZA MOTOR DE EXTRACION, S/M, S/M HEAD;MOT,562,S/A,RLOY,UT,BOLT-ON,MAXIMUS P/N: 100291095 USADO EN LA INDUSTRIA PETROLERA PO NUMBER- SO NUMBER: 4584535413 - 21650902,PLAZO DE 180 DIAS, CONTABILIZADOS A PARTIR DE | SINGAPORE | ECUADOR | 2888.66 |