| TUMBES | 2024 | 1 | U | TUBE, COMPRESSION: PUMP, 675 & 675/738, S/M, S/M TUBE, COMPRESSION: PUMP, 675 & 675/738 P/N: 0614057 PARA LA INDUSTRIA PETROLERA PLAZO: 180 DÍAS DESDE LA FECHA DE FACTURA | SINGAPORE | ECUADOR | 460.01 |
| TUMBES | 2024 | 2 | U | SHIM: PMP HSG, .020 6.75 OD, 6.39 ID, M, S/M, S/M SHIM: PMP HSG, .020 6.75 OD, 6.39 ID, M P/N: 7004625 PARA LA INDUSTRIA PETROLERA PLAZO: 180 DÍAS DESDE LA FECHA DE FACTURA | SINGAPORE | ECUADOR | 13.65 |
| TUMBES | 2024 | 4 | U | SHIM: THRST BRG, PROT 540, 66 TYPE, .01, S/M, S/M SHIM: THRST BRG, PROT 540, 66 TYPE, .01 P/N: 0612952 PARA LA INDUSTRIA PETROLERA PLAZO: 180 DÍAS DESDE LA FECHA DE FACTURA | SINGAPORE | ECUADOR | 17.07 |
| AEREA Y POSTAL EX-IAAC | 2024 | 4 | U | LAINA DE AJUSTE, S/M, S/M SHIM: PMP SFT SETTING, .005 .87 302SS P/N: 7019599 PARA BOMBA ELECTROSUMNERGIBLES PAGO A CREDITO 180 DIAS CONTABILIZADO A PARTIR DE LA FECHA DE SU POSTEO EN SAP: 18-06-24 | SINGAPORE | COLOMBIA | 4.27 |
| AEREA Y POSTAL EX-IAAC | 2024 | 4 | U | LAINA, S/M, S/M SHIM: PMP SFT SETTING 1.18, 1.37, 1.50 P/N: 7070733 PARA BOMBA ELECTROSUMERGIBLES PAGO A CREDITO 180 DIAS CONTABILIZADO A PARTIR DE LA FECHA DE SU POSTEO EN SAP: 18-06-24 | SINGAPORE | COLOMBIA | 4.78 |
| TUMBES | 2024 | 1 | U | SHIM: PMP HSG, .030 6.75 OD, 6.39 ID, M, S/M, S/M SHIM: PMP HSG, .030 6.75 OD, 6.39 ID, M P/N: 7006828 PARA LA INDUSTRIA PETROLERA PLAZO: 180 DÍAS DESDE LA FECHA DE FACTURA | SINGAPORE | ECUADOR | 8.56 |
| TUMBES | 2024 | 12 | U | CUERPO, S/M, S/M BODY: PROT 540, S/A, 1.18, BOLT-ON, RLO P/N: 100263001 PARA LA INDUSTRIA PETROLERA PLAZO: 180 DÍAS DESDE LA FECHA DE FACTURA | SINGAPORE | ECUADOR | 4708.57 |
| TUMBES | 2024 | 1 | U | DIFUSORES, S/M, S/M DIFFUSER: LWR, J12000N, 1.18, NI-RST P/N: 1304666 PARA USO EN LA INDUSTRIA PETROLERA PAGO A 180 DIAS DE LA FECHA DE FACTURA | SINGAPORE | ECUADOR | 136.8 |
| TUMBES | 2024 | 3 | U | ANILLO DE RETENCION, S/M, S/M COLLAR, RING: TWO PIECE, 1.18, SSM 540, P/N: 101409020 PARA USO EN LA INDUSTRIA PETROLERA PAGO A 180 DAS DE LA FECHA DE FACTURA | SINGAPORE | ECUADOR | 207.55 |
| TUMBES | 2024 | 8 | U | TUBO EJE PROTECTOR, S/M, S/M TUBE: SHAFT, PROT 540, BAG TYP, 1.18, R P/N: 1069814 PARA USO EN LA INDUSTRIA PETROLERA PLAZO: 180 DÍAS DESDE LA FECHA DE FACTURA | SINGAPORE | ECUADOR | 8659.33 |
| TUMBES | 2024 | 1 | U | DIFUSOR, S/M, S/M DIFFUSER: TOP, J12000N, 1.18, V2, NI-RST P/N: 100246069 PARA USO EN LA INDUSTRIA PETROLERA PLAZO: 180 DÍAS DESDE LA FECHA DE FACTURA | SINGAPORE | ECUADOR | 210.31 |
| AEREA Y POSTAL EX-IAAC | 2024 | 1 | U | CABEZAL, S/M, S/M HEAD;MOT,562,S/A,RLOY,UT,BOLT-ON,MAXIMUS P/N: 100291095 PARA BOMBA ELECTROSUMERGIBLES PAGO A CREDITO: 180 DIAS CONTABILIZADO A PARTIR DE SU FECHA DE POSTEO EN SAP: 21/08/24 | SINGAPORE | ECUADOR | 1355.11 |