| AEREA Y POSTAL EX-IAAC | 2024 | 1 | U | CARCASA DE RODAMIENTOS DE MTA, S/M, S/M MTA BEARING HOUSING - MACHINED/COATED P/N: S-298871 PROTEGER RODAMIENTOS TELESCOPE FIERRO,DAT=DPU 2020, PAGO CREDITO: 180 DIAS CONTAB. PARTIR FECHA DE POSTEO EN SAP:04/09/24 | CHINA | UNITED STATES | 3488.78 |
| AEREA Y POSTAL EX-IAAC | 2024 | 1 | U | CROSSOVER, CARCASA 9-5/8" CONVENCIONAL, S/M, S/M SUB, CASING 9-5/8 IN CONVENTIONAL CASING SUB P/N: 102097032 UTILIZADO EN OPERACIONES DE CEMENTACIÓN PARA POZOS PETROLEROS ACERO | UNITED STATES | UNITED STATES | 1308.98 |
| TUMBES | 2024 | 1 | U | EJE DE TRANSMISION, S/M, S/M SHAFT: MTR, 562 1.37 SOL STL, S 15SECT P/N: 100930884 PARA USO EN LA INDUSTRIA PETROLERA PAGO A 180 DIAS DE LA FECHA DE FACTURA | CHINA | COLOMBIA | 890.01 |
| TUMBES | 2024 | 1 | U | SHAFT: PMP, 675 1.18 INC 718, C-CT #150, S/M, S/M SHAFT: PMP, 675 1.18 INC 718, C-CT #150 P/N: 100251564 PARA LA INDUSTRIA PETROLERA PLAZO 30 DIAS | SINGAPORE | ECUADOR | 3528.87 |
| TUMBES | 2024 | 2 | U | DIFUSOR, S/M, S/M SHAFT: PMP, 675 1.18 INC 718, C-CT #150 P/N: 100251564 PARA USO EN LA INDUSTRIA PETROLERA PLAZO: 180 DÍAS DESDE LA FECHA DE FACTURA | SINGAPORE | ECUADOR | 8083.29 |
| TUMBES | 2024 | 3 | U | EJE PROTECTOR, S/M, S/M SHAFT: PROT 540, 1.18 INC 718, MODULAR P/N: 103235353 PARA USO EN LA INDUSTRIA PETROLERA PAGO A 180 DIAS DE LA FECHA DE FACTURA | UNITED STATES | ECUADOR | 4857.26 |
| TUMBES | 2024 | 1 | U | SHAFT: PROT 540, S/M, S/M SHAFT: PROT 540, 1.18 INC 718, MODULAR P/N: 103235353 PARA LA INDUSTRIA PETROLERA PLAZO: 30 DÍAS DESDE LA FECHA DE FACTURA | UNITED STATES | ECUADOR | 3168.38 |
| AEREA Y POSTAL EX-IAAC | 2024 | 1 | U | EJE, S/M, S/M SHAFT: INTK, 562/540 1.18 INC, ARZ P/N: 1108034 PARA USO EN LA INDUSTRIA PETROLERA PAGO A CREDITO 180 DIAS CONTABILIZADO A PARTIR DE LA FECHA DE SU POSTEO EN SAP: 18-06-24 | UNITED STATES | COLOMBIA | 392.73 |
| AEREA Y POSTAL EX-IAAC | 2024 | 2 | U | EJE DE TRANSMISION, S/M, S/M A962M, DRIVE SHAFT, 7-5/8 REG P/N: S-291229 TRANSMISION DE MOVIMIENTO EN MOTOR DE PERFORACION ACERO,PAGO A CREDITO: 180 DIAS CONTABILIZADO A PARTIR DE LA FECHA DE SU POSTEO EN SAP: 18- | UNITED STATES | UNITED STATES | 21239.1 |
| AEREA Y POSTAL EX-IAAC | 2024 | 1 | U | ACOPLAMIENTO DEL ROTOR, S/M, S/M COUPLING:DRIVE;RTR,A962 MOTOR,7:8 GT P/N: S-297274 MECANISMO QUE PERMITE LA UNION DE DOS EJES PARA LA TRANSMISION DE POTENCIA MECANICA DE UN ACERO,PAGO A CREDITO 180 DIAS CONTABILIZADO A PARTIR DE LA FECHA DE SU POSTE | UNITED STATES | COLOMBIA | 2594.18 |
| MARITIMA DEL CALLAO | 2024 | 2 | U | EJE, S/M, S/M SHAFT: PROT 540, 1.18 INC 718, MODULAR P/N: 100261194 PARA USO EN LA INDUSTRIA PETROLERA | UNITED STATES | COLOMBIA | 9868.22 |
| MARITIMA DEL CALLAO | 2024 | 1 | U | EJE, S/M, S/M SHAFT: PROT 540, 1.18 INC 718, MODULAR P/N: 103235353, PARA USO EN LA INDUSTRIA PETROLERA | UNITED STATES | COLOMBIA | 3956.39 |