| TUMBES | 2025 | 27 | U | SEPARADOR DE ACOPLAMIENTO, S/M, S/M CPLG SHIM: PMP, 1.00 & 1.18 SFT, K MONE P/N: 0614479 PARA EL USO EN LA INDUSTRIA PETROLERA PO: 458448586 - 21622197,CREDITO 180 DIAS, A PARTIR DE SU FECHA DE POSTEO EN SAP 01 OCTUB | UNITED STATES | ECUADOR | 142.26 |
| TUMBES | 2025 | 100 | U | PROTECTOR DE COJINETE, S/M, S/M SHIM, THRUST RUNNER: PROTECTOR, 540 SER P/N: 7002165 PARA INSTALACION EN LA INDUSTRIA PETROLERA PO: 4584441383- 21619888,CREDITO 180 DIAS, A PARTIR DE SU FECHA DE POSTEO EN SAP 01 OCTUB | UNITED STATES | ECUADOR | 113.94 |
| AEREA Y POSTAL EX-IAAC | 2025 | 15 | U | SEPARADOR DE COUPLING, S/M, S/M CPLG SHIM: PMP, 1.00 & 1.18 SFT, K MONE P/N: 0614461 USO EN LA INDUSTRIA PETROLERA | UNITED STATES | COLOMBIA | 30.02 |
| AEREA Y POSTAL EX-IAAC | 2025 | 2 | U | PUERTO DE ENGRASE 1/8", S/M, S/M GREASE FTG-STR,1/8 NPT STD P/N: 005929-18 PUERTO DE INYECCION DE GRASA PARA BOMBAS ACERO,PAGO A CREDITO 180 DIAS CONTABILZADO A PARTIR DE FECHA DE POSTEO EN SAP: 24-09-25 | UNITED STATES | COLOMBIA | 1.3 |
| AEREA Y POSTAL EX-IAAC | 2025 | 1 | U | SEPARADOR DE COUPLING, SLB, S/M CPLG SHIM: PMP, 1.00 & 1.18 SFT, K MONE P/N: 0614461 EN SISTEMA DE BOMBAS ELECTROSUMERGIBLES PAGO A CREDITO 180 DIAS CONTAB. A PARTIR DE FECHA DE POSTEO EN SAP: 27-08-25 | UNITED STATES | COLOMBIA | 2.01 |
| AEREA Y POSTAL EX-IAAC | 2025 | 4 | U | ANILLO DE SELLO, S/M, S/M RETAINER,SEGMENT 2 IN (DOCMT`D) FIG 1502 SPCL UNION WECO 3208193 NUT, 3 REQD, 50 P/N: 415472090 COMO SEGURO DEL SELLO EN EL POWER END DE BOMBAS TRIPLEX ACERO ,INCOTERMS DPU 2020, PAGO CREDITO 180 DIAS , CONTAB. PARTIR, FECHA | UNITED STATES | UNITED STATES | 48.9 |
| AEREA Y POSTAL EX-IAAC | 2025 | 2 | U | ANILLO DE SELLO, S/M, S/M RETAINER,SEGMENT 2 IN (DOCMT`D) FIG 1502 SPCL UNION WECO 3208193 NUT, 3 REQD, 50 P/N: 415472090 COMO SEGURO DEL SELLO EN EL POWER END DE BOMBAS TRIPLEX ACERO,INCOTERMS DPU 2020, PAGO CREDITO: 180 DIAS CONTAB. PARTIR FECHA P | UNITED STATES | UNITED STATES | 25.6 |
| AEREA Y POSTAL EX-IAAC | 2025 | 25 | U | ANILLO DE SELLO, S/M, S/M RETAINER,SEGMENT 2 IN (DOCMT`D) FIG 1502 SPCL UNION WECO 3208193 NUT, 3 REQD, 50 P/N: 415472090 COMO SEGURO DEL SELLO EN EL POWER END DE BOMBAS TRIPLEX ACERO,INCOTERMS DPU 2020, PAGO CREDITO: 180 DIAS CONTAB. PARTIR FECHA | UNITED STATES | UNITED STATES | 319.97 |
| AEREA Y POSTAL EX-IAAC | 2025 | 2 | U | ANILLO DE SELLO, S/M, S/M RNG/SEAL/PKG/3.50/TWS600S P/N: 101607083, SUPPLIER PART NUMBER: 3P103034 COMO SEGURO DEL SELLO EN EL POWER END DE BOMBAS TRIPLEX ACERO,INCOTERMS DPU 2020, PAGO CREDITO: 180 DIAS CONTAB. PARTIR FECHA POSTEO EN SAP: 19-0 | UNITED STATES | UNITED STATES | 335.98 |
| TUMBES | 2025 | 6 | U | CPLG SHIM: PMP, 1.00 & 1.18 SFT, K MONE, S/M, S/M CPLG SHIM: PMP, 1.00 & 1.18 SFT, K MONE P/N: 0614479 PARA LA INDUSTRIA PETROLERA PLAZO DE 180 DIAS, CONTABILIZADOS A PARTIR DE SU FECHA DE POSTEO EN SAP | UNITED STATES | ECUADOR | 25.9 |
| TUMBES | 2025 | 16 | U | SHIM: 1.43 IN OD X 1.191 IN ID, .005 TH, S/M, S/M SHIM: 1.43 IN OD X 1.191 IN ID, .005 TH P/N: 100539896 PARA USO EN LA INDUSTRIA PETROLERA PLAZO DE 180 DIAS, CONTABILIZADOS A PARTIR DE SU FECHA DE POSTEO EN SAP | UNITED STATES | ECUADOR | 163.7 |
| TUMBES | 2025 | 57 | U | BRG HSG: S/A, J12000N, 1.18, ARZ-T, NI, S/M, S/M BRG HSG: S/A, J12000N, 1.18, ARZ-T, NI P/N: 101569733 PARA USO EN LA INDUSTRIA PETROLERA PLAZO DE 180 DIAS, CONTABILIZADOS A PARTIR DE SU FECHA DE POSTEO EN SAP | UNITED STATES | ECUADOR | 20286.6 |