| TUMBES | 2025 | 1 | U | CABEZA DE DESCARGA, S/M, S/M HEAD: BOLT ON DISCHARGE PMP, 540, RLOY P/N: 0492231 PARA USO EN LA INDUSTRIA PETROLERA PLAZO: 30 DÍAS DESDE LA FECHA DE FACTURA | CHINA | ECUADOR | 303.54 |
| TUMBES | 2025 | 2 | U | ALOJAMIENTO O CARCAZA, S/M, S/M HOUSING: PUMP, 675 SERIES #150, REDALLO P/N: 1009059 PARA USO EN LA INDUSTRIA PETROLERA PLAZO: 180 DÍAS DESDE LA FECHA DE FACTURA | CHINA | ECUADOR | 13803.4 |
| AEREA Y POSTAL EX-IAAC | 2025 | 3 | U | CABEZA DE DESCARGA , S/M, S/M HEAD: BOLT ON DISCH, PMP 675 RLOY, 4.50 P/N: 1346212 SE EMPLEA PARA LA EXTRACCION DE PETROLEO DESDE EL FONDO DE POZO, EN EL EQUIPO DE BOMBEO EL METALICO ,PAGO A CREDITO: 180 DIAS, CONTABILIZADO A PARTIR DE FECHA DE POSTE | ECUADOR | ECUADOR | 3539.03 |
| TUMBES | 2025 | 2 | U | PROTECTOR: ADVANCED, MAXIMUS, LSBPB, 54, SLB, S/M PROTECTOR: ADVANCED, MAXIMUS, LSBPB, 54 P/N: 104595453 / S/N: N/A PARA USO EN LA INDUSTRIA PETROLERA PO 4584120418 / SO 21518364,PLAZO: 180 DÍAS DESDE EL POSTEO DE LA FACTURA EN SAP 20 MAYO | ECUADOR | ECUADOR | 22099.7 |
| AEREA Y POSTAL EX-IAAC | 2025 | 4 | U | LAINA, S/M, S/M SHIM: PMP HSG, .030 6.75 OD, 6.39 ID, M P/N: 7006828 PARA BOMBA ELECTROSUMERGIBLE | UNITED KINGDOM | UNITED STATES | 29.62 |
| AEREA Y POSTAL EX-IAAC | 2025 | 1 | U | PROTECTOR DE SOLDADURA TUBO DE ALIMENTACION CENTRIFUGA, S/M, S/M WLDMENT PROTECTOR FEED TUBE 518 HV P/N: 9610841 BOMBAS CENTRIFUGAS P/PROTEGER LAS PARTES INTERNAS DEL TUBO DE ALIMENTACION PRINCIPAL POR D ACERO,INCOTERM DPU 2020, PAGO CREDITO: 180 DIA | ITALY | UNITED STATES | 367.08 |
| TUMBES | 2025 | 4 | U | LINEA DE PRESION, S/M, S/M ASSY: PRESSURE TRANSFER LINE, 160 FT, 3 P/N: 100120402 PARA USO EN LA INDUSTRIA PETROLERA PLAZO: 30 DÍAS DESDE LA FECHA DE FACTURA | MALAYSIA | ECUADOR | 4628.07 |
| AEREA Y POSTAL EX-IAAC | 2025 | 1 | U | BLOQUE, S/M, S/M BLOCK: SPCR, SHIPPING CAP 2.81 IN P/N: 100090678 SE EMPLEA COMO COMPONENTE PARA EL ARMADO DE BOMBAS CENTRIFUGAS QUE INTEGRAN EL SISTEMA DE METALICO,PAGO A CREDITO 180 DIAS CONTABILIZADO A PARTIR FECHA DE POSTEO EN SAP: 28-08-25 | NEW ZEALAND | ECUADOR | 113.87 |
| TUMBES | 2025 | 4 | U | RUNNER: PROT 540, 1.18, S/M, S/M RUNNER: PROT 540, 1.18 P/N: 0912568 PARA LA INDUSTRIA PETROLERA PLAZO DE 180 DIAS, CONTABILIZADOS A PARTIR DE SU FECHA DE POSTEO EN SAP | SINGAPORE | ECUADOR | 428.27 |
| TUMBES | 2025 | 16 | U | SHIM: PMP SFT SETTING, .005 .87 302SS, S/M, S/M SHIM: PMP SFT SETTING, .005 .87 302SS P/N: 7019599 PARA USO EN LA INDUSTRIA PETROLERA PLAZO DE 180 DIAS, CONTABILIZADOS A PARTIR DE SU FECHA DE POSTEO EN SAP | SINGAPORE | ECUADOR | 16.34 |
| AEREA Y POSTAL EX-IAAC | 2025 | 2 | U | DIFUSOR, S/M, S/M DIFFUSER: LWR, 8000 BPD, S SERIES, 1.00 P/N: 100394254 GUIAR EL FLUJO DEL FLUIDO DENTRO DE LA BOMBA, MAXIMIZANDO LA EFICIENCIA HIDRAULICA Y REDUC NI-RST | SINGAPORE | ECUADOR | 118.42 |
| TUMBES | 2025 | 46 | U | IMPULSOR COMPRESOR, S/M, S/M IMPELLER:COMP, 8000 BPD, S SERIES, 1.0 P/N:100345271 PARA BAMBA SUMERGIBLE USADA EN LA INDUSTRIA PETROLERA CREDITO 180 DIAS, A PARTIR DE SU FECHA DE POSTEO EN SAP: 13/09 | SINGAPORE | ECUADOR | 2476.89 |