| TUMBES | 2025 | 2 | U | HOUSING: PUMP, 675 SERIES #150, REDALLO, S/M, S/M HOUSING: PUMP, 675 SERIES #150, REDALLO P/N: 1009059 PARA LA INDUSTRIA PETROLERA PLAZO DE 180 DIAS, CONTABILIZADOS A PARTIR DE SU FECHA DE POSTEO EN SAP | CHINA | ECUADOR | 14393.9 |
| AEREA Y POSTAL EX-IAAC | 2025 | 8 | U | CABEZA MULTIPUNTO, S/M, S/M HEAD INJECTION MULTIPOINT 360GRA P/N: 104211091, S/N: SIPATL172251, SIPATL172253, SIPATL175251, SIPATL175253, SIPATL175254, SE EMPLEA PARA LA DISPERSION DE PRODUCCION QUIMICO DE POZO DE PETROLEO METALICO,PAGO A CREDITO 180 | ECUADOR | ECUADOR | 5269.56 |
| AEREA Y POSTAL EX-IAAC | 2025 | 1 | U | LEVA DE SALIDA, SHIMPO DRIVES, RXC 37 CAM OUTPUT ITEM 15 SHIMPO SIZE 37 DRIVE P/N 9340035 PARTE DEL SISTEMA DE VARIACION DE VELOCIDAD DE UNA BOMBA DE CAVIDAD PROGRESIVA DE LA BOMBA ACERO,INCOTERMS DPU 2020, PAGO CREDITO, 180 DIAS, CONTAB PARTIR, FECH | JAPAN | UNITED STATES | 840.04 |
| AEREA Y POSTAL EX-IAAC | 2025 | 1 | U | BLOQUE, SLB, S/M BLOCK: SPCR, SHIPPING CAP 2.81 IN P/N: 100090678 SE EMPLEA COMO COMPONENTE PARA EL ARMADO DE BOMBAS CENTRIFUGAS QUE INTEGRAN EL SISTEMA DE METALICO,PAGO A CREDITO 180 DIAS, CONTABILIZADO,A PARTIR DE FECHA DE POSTEO EN SAP: 28-08 | NEW ZEALAND | COLOMBIA | 9.25 |
| TUMBES | 2025 | 16 | U | SHIM: PMP SFT SETTING 1.18, 1.37, 1.50, S/M, S/M SHIM: PMP SFT SETTING 1.18, 1.37, 1.50 P/N: 7070741 PARA USO EN LA INDUSTRIA PETROLERA PO: 4584074830 - 21505514,PAGO 180 DIAS DESPUES DE LA FECHA DE PUBLICACION DE FACTURA EN S | SINGAPORE | ECUADOR | 18.57 |
| TUMBES | 2025 | 2 | U | BASE: PMP, 675 S/A RLOY BTHD, 1.18 C-CT, S/M, S/M BASE: PMP, 675 S/A RLOY BTHD, 1.18 C-CT P/N: 100988142 PARA USO EN LA INDUSTRIA PETROLERA PLAZO DE 180 DIAS, CONTABILIZADOS A PARTIR DE SU FECHA DE POSTEO EN SAP | SINGAPORE | ECUADOR | 2155.75 |
| TUMBES | 2025 | 2 | U | BASE: PMP, 675 S/A RLOY BTHD, 1.18 C-CT, S/M, S/M HEAD: PMP, 675 S/A RLOY BTHD, 1.18 C-CT P/N: 100988142 PARA USO EN LA INDUSTRIA PETROLERA PLAZO DE 180 DIAS, CONTABILIZADOS A PARTIR DE SU FECHA DE POSTEO EN SAP | SINGAPORE | ECUADOR | 1846.39 |
| TUMBES | 2025 | 1 | U | ACOPLE, S/M, S/M COUPLING: ONE PIECE, .69-6A X .87-6A SP P/N: 100570686 PARA USO EN LA INDUSTRIA PETROLERA PLAZO: 30 DÍAS DESDE LA FECHA DE FACTURA | SINGAPORE | ECUADOR | 49.99 |
| TUMBES | 2025 | 5 | U | ACOPLAMIENTO, S/M, S/M COUPLING: S/A, 1.18-6B SPL, MON, 538 BO P/N: 100191221 PARA USO EN LA INDUSTRIA PETROLERA PLAZO: 30 DÍAS DESDE LA FECHA DE FACTURA | SINGAPORE | ECUADOR | 1148.02 |
| TUMBES | 2025 | 5 | U | PROTECTOR BASE, S/M, S/M BASE: PROT 540, S/A, 1.18, BOLT-ON, RLO P/N:100263005 PARA BOMBA SUMERGIBLE SERIAL NUMBER: N/A,CREDITO 180 DIAS, A PARTIR DE SU FECHA DE POSTEO EN SAP: 13/09 | SINGAPORE | ECUADOR | 2101.58 |
| TUMBES | 2025 | 1 | U | DIFUSOR, S/M, S/M DIFFUSER: LWR, 8000 BPD, S SERIES, 1.00 P/N:100394254 PARA BOMBA SUMERGIBLE USADA EN LA INDUSTRIA PETROLERA SERIAL NUMBER: N/A,CREDITO 180 DIAS, A PARTIR DE SU FECHA DE POSTEO EN SAP: 13/09 | SINGAPORE | ECUADOR | 62.94 |
| TUMBES | 2025 | 45 | U | DIFUSOR, S/M, S/M DIFFUSER: S8000N,1.00, NI RST, V2 P/N:100810702 PARA BAMBA SUMERGIBLE USADA EN LA INDUSTRIA PETROLERA SERIAL NUMBER: N/A,CREDITO 180 DIAS, A PARTIR DE SU FECHA DE POSTEO EN SAP: 13/09 | SINGAPORE | ECUADOR | 2108.62 |