| TUMBES | 2024 | 1 | U | SPACER: THRUST BRG, PROT 540, STD, 4.5O, S/M, S/M SPACER: THRUST BRG, PROT 540, STD, 4.5O P/N: 0386854 PARA LA INDUSTRIA PETROLERA PLAZO: 180 DÍAS POSTERIOR A LA FECHA DE FACTURA | SINGAPORE | ECUADOR | 14.58 |
| TUMBES | 2024 | 6 | U | HOUSING: PROT, 540 RLOY, MODULAR, S/M, S/M HOUSING: PROT, 540 RLOY, MODULAR P/N: 1069780 PARA LA INDUSTRIA PETROLERA PLAZO 30 DIAS | SINGAPORE | ECUADOR | 3130.64 |
| TUMBES | 2024 | 2 | U | RING: LOCK, PROT 540 CS, 1.18 MODULAR, S/M, S/M RING: LOCK, PROT 540 CS, 1.18 MODULAR P/N: 1130509 PARA LA INDUSTRIA PETROLERA PLAZO 30 DIAS | SINGAPORE | ECUADOR | 85.61 |
| TUMBES | 2024 | 1 | U | TUBE, COMPRESSION: PUMP, 675 & 675/738, S/M, S/M TUBE, COMPRESSION: PUMP, 675 & 675/738 P/N: 0614057 PARA LA INDUSTRIA PETROLERA PLAZO 30 DIAS | SINGAPORE | ECUADOR | 475.14 |
| TUMBES | 2024 | 6 | U | BASE: INTK 675/540 S/A RLOY 1.18, ARZ-T, S/M, S/M BASE: INTK 675/540 S/A RLOY 1.18, ARZ-T P/N: 102908874 PARA LA INDUSTRIA PETROLERA PLAZO 30 DIAS | SINGAPORE | ECUADOR | 16225.1 |
| TUMBES | 2024 | 6 | U | HEAD: BOLT ON DISCHARGE PMP, 675, RLOY,, S/M, S/M HEAD: BOLT ON DISCHARGE PMP, 675, RLOY, P/N: 0997353 PARA LA INDUSTRIA PETROLERA PLAZO 30 DIAS | SINGAPORE | ECUADOR | 5354.94 |
| TUMBES | 2024 | 1 | U | HEAD: PMP, 675 S/A RLOY BTHD, 1.18 C-CT, S/M, S/M HEAD: PMP, 675 S/A RLOY BTHD, 1.18 C-CT P/N: 100988154 PARA USO EN LA INDUSTRIA PETROLERA | SINGAPORE | ECUADOR | 851.69 |
| TUMBES | 2024 | 1 | U | BASE: PMP, 675 S/A RLOY BTHD, 1.18 C-CT, S/M, S/M BASE: PMP, 675 S/A RLOY BTHD, 1.18 C-CT P/N: 100988142 PARA USO EN LA INDUSTRIA PETROLERA | SINGAPORE | ECUADOR | 1128.57 |
| MARITIMA DEL CALLAO | 2024 | 2 | U | LAINA, S/M, S/M SHIM: PMP SFT SETTING 1.18, 1.37, 1.50 P/N: 7070733, PARA BOMBA ELECTROSUMERGIBLE | SINGAPORE | COLOMBIA | 2.7 |
| TUMBES | 2024 | 1 | U | TUBE;1.875 IN, S/M, S/M TUBE;1.875 IN,PROTECTR ALL SER,304 P/N: 1186675 PARA LA INDUSTRIA PETROLERA PLAZO: 30 DÍAS DESDE LA FECHA DE FACTURA | SINGAPORE | ECUADOR | 5.06 |
| TUMBES | 2024 | 1 | U | BASE: PMP, 675 S/A RLOY BTHD, 1.18 C-CT, S/M, S/M BASE: PMP, 675 S/A RLOY BTHD, 1.18 C-CT P/N: 100988142 PARA LA INDUSTRIA PETROLERA PLAZO: 180 DÍAS DESDE LA FECHA DE FACTURA | SINGAPORE | ECUADOR | 1151.89 |
| AEREA Y POSTAL EX-IAAC | 2024 | 4 | U | LAINA, S/M, S/M SHIM: PMP SFT SETTING, .010 .87 302SS P/N: 7019607 PARA BOMBA ELECTROSUMERGIBLE PAGO A CREDITO 180 DIAS CONTABILIZADO A PARTIR DE LA FECHA DE SU POSTEO EN SAP: 18-06-24 | SINGAPORE | COLOMBIA | 3.09 |