| TUMBES | 2024 | 2 | U | CABEZAL, S/M, S/M HEAD;MOT,562,S/A,RLOY,UT,BOLT-ON,MAXIMUS P/N: 100291095 PARA USO EN LA INDUSTRIA PETROLERA PLAZO: 180 DÍAS DESDE LA FECHA DE FACTURA | SINGAPORE | ECUADOR | 2789.2 |
| AEREA Y POSTAL EX-IAAC | 2024 | 4 | U | PROTECTOR TUBULAR, S/M, S/M TUBE: SHAFT, PROT 540, BAG TYP, 1.18, R P/N: 1069814 PARA BOMBA ELECTROSUMERGIBLE PAGO A CREDITO: 180 DIAS CONTABILIZADO A PARTIR DE SU FECHA DE POSTEO EN SAP: 21/08/24 | SINGAPORE | ECUADOR | 4252.53 |
| TUMBES | 2024 | 1 | U | CUÑA, S/M, S/M KEY: UPTHRUST SPACER, MTR 562, MAXIMUS P/N: 100988742 PARA USO EN LA INDUSTRIA PETROLERA PAGO A 180 DIAS DE LA FECHA DE FACTURA | SINGAPORE | COLOMBIA | 17.39 |
| TUMBES | 2024 | 3 | U | CAP: SHIPPING PMP 675, S/M, S/M CAP: SHIPPING PMP 675 P/N: 0169797 PARA LA INDUSTRIA PETROLERA PLAZO 30 DIAS | THAILAND | ECUADOR | 163.84 |
| AEREA Y POSTAL EX-IAAC | 2024 | 2 | U | TAPA DE EMBARQUE, S/M, S/M CAP, SHIPPING: PROTECTOR, MOTOR, PSI, P P/N: 0068825 PARA BOMBA ELECTROSUMERGIBLE PAGO A CREDITO: 180 DIAS CONTABILIZADO A PARTIR DE SU FECHA DE POSTEO EN SAP: 26/8/24 | THAILAND | UNITED STATES | 37.4 |
| TUMBES | 2024 | 1 | U | CPLG SHIM: PMP, 1.00 & 1.18 SFT, K MONE, S/M, S/M CPLG SHIM: PMP, 1.00 & 1.18 SFT, K MONE P/N: 0614479 PARA LA INDUSTRIA PETROLERA PLAZO: 180 DÍAS DESDE LA FECHA DE FACTURA | THAILAND | ECUADOR | 3.99 |
| TUMBES | 2024 | 3 | U | CAP: SHIPPING PMP 675, S/M, S/M CAP: SHIPPING PMP 675 P/N: 0169797 PARA LA INDUSTRIA PETROLERA PLAZO: 180 DÍAS DESDE LA FECHA DE FACTURA | THAILAND | ECUADOR | 145.39 |
| AEREA Y POSTAL EX-IAAC | 2024 | 2 | U | PLATO DE BOMBA, S/M, S/M PLATE,CENTRIFUGAL PUMP REAR WEAR STEEL REQUIRES O-RINGS #242 & 272 P/N: 434017000, SUPPLIER PART NUMBER: 34017 PARA USO EN LA BOMBA CENTRIFUGA DAT=DPU 2020, PAGO CREDITO 180 DIAS CONTAB. PARTIR DE FECHA DE POSTEO EN SAP: 19/1 | UNITED STATES | UNITED STATES | 287.19 |
| AEREA Y POSTAL EX-IAAC | 2024 | 3 | U | ALOJAMIENTO O CARCAZA, S/M, S/M HOUSING: PROT, 540 RLOY, MODULAR P/N: 1069780 PARA BOMBA ELECTROSUMERGIBLE PAGO A CREDITO: 180 DIAS CONTABILIZADO A PARTIR DE SU FECHA DE POSTEO EN SAP: 29/10/24 | UNITED STATES | UNITED STATES | 1066.47 |
| AEREA Y POSTAL EX-IAAC | 2024 | 2 | U | PLATO DE BOMBA, S/M, S/M PLATE,CENTRIFUGAL PUMP REAR WEAR STEEL P/N: 434017000 PARA USO EN LA BOMBA CENTRIFUGA PAGO A CREDITO: 180 DIAS CONTABILIZADO A PARTIR DE SU FECHA DE POSTEO EN SAP: 24/10/24 | UNITED STATES | UNITED STATES | 245.34 |
| AEREA Y POSTAL EX-IAAC | 2024 | 23 | U | ESPACIADOR, S/M, S/M SPACER: IMP, 1.18 X 2.99L P/N: 1292804 PARA BOMBA ELECTROSUMERGIBLES PAGO A CREDITO: 180 DIAS CONTABILIZADO A PARTIR DE SU FECHA DE POSTEO EN SAP: 02/10/24 | UNITED STATES | UNITED STATES | 439.93 |
| AEREA Y POSTAL EX-IAAC | 2024 | 15 | U | ESPACIADOR DE IMPULSOR, S/M, S/M SPACER: IMP, 1.18 X 1.866L P/N: 1292812 PARA BOMBA ELECTROSUMERGIBLES PAGO A CREDITO: 180 DIAS CONTABILIZADO A PARTIR DE SU FECHA DE POSTEO EN SAP: 02/10/24 | UNITED STATES | UNITED STATES | 243.3 |