| AEREA Y POSTAL EX-IAAC | 2024 | 1 | U | UNIDAD DE TRANSMISION DE TORQUE DE DOS VELOCIDADES, S/M, S/M W9T, TORQUE HUB DRIVE, TWO SPEED , 143 :1 AND 35 :1 RATIOS, MAX CONT. TORQUE 10k P/N: 102086540, S/N: D24AV3709 ES USADO EN LA UNIDAD DE WINCHE WDDS-A PARA LOS REGISTROS EN POZOS PETROLEROS | UNITED STATES | NETHERLANDS | 17120.1 |
| AEREA Y POSTAL EX-IAAC | 2024 | 1 | U | ACOPLE, S/M, S/M SHAFT COUPLING, A962M MOTOR P/N: S-272838 MECANISMO QUE PERMITE LA UNION DE DOS EJES PARA LA TRANSMISION DE POTENCIA MECANICA DE UN ACERO,PAGO A CREDITO: 180 DIAS CONTABILIZADO A PARTIR DE LA FECHA DE SU POSTEO EN SAP: 18- | CANADA | UNITED STATES | 1789.24 |
| AEREA Y POSTAL EX-IAAC | 2024 | 1 | U | ACOPLE, S/M, S/M SHAFT COUPLING, A962M MOTOR P/N: S-272838 MECANISMO QUE PERMITE LA UNION DE DOS EJES PARA LA TRANSMISION DE POTENCIA MECANICA DE UN ACERO,DAT=DPU 2020, PAGO A CREDITO 180 DIAS CONTAB. A PARTIR DE FECHA DE POSTEO EN SAP 15- | CHINA | UNITED STATES | 1861.56 |
| TUMBES | 2024 | 1 | U | COUPLING: S/A, 1.19-6B SPL TO 1.37 INVO, S/M, S/M COUPLING: S/A, 1.19-6B SPL TO 1.37 INVO P/N: 1067636 PARA LA INDUSTRIA PETROLERA PLAZO: 180 DÍAS DESDE LA FECHA DE FACTURA | SINGAPORE | ECUADOR | 145.76 |
| AEREA Y POSTAL EX-IAAC | 2024 | 1 | U | PALANCE DE ACCESORIO MANUAL, S/M, S/M 140G/1494V OPERATING MECH, 21 INCH R/Y:SPN-PN-232962,SUPPLIER-SENSIA FZE. P/N: 104750437, SUPPLIER PART NUMBER: PN-232962 REPUESTO PARA VARIADOR DE VELOCIDAD DAT=DPU 2020, PAGO CREDITO: 180 DIAS CONTAB. A PARTIR | MALAYSIA | UNITED STATES | 258.63 |
| TUMBES | 2024 | 9 | U | SHIM: THRST BRG, PROT 540, MODULAR, .00, S/M, S/M SHIM: THRST BRG, PROT 540, MODULAR, .00 P/N: 1130533 PARA LA INDUSTRIA PETROLERA PLAZO 30 DIAS | UNITED STATES | ECUADOR | 12.09 |
| AEREA Y POSTAL EX-IAAC | 2024 | 3 | U | BASE MANIJA DE PALANCA , S/M, S/M LEVER/BASE HANDLE ASSEMBLY P/N: 103427436 SE USA COMO MANDO DE LA CONSOLA PARA LA MAQUINA DE TORQUE, SIRVE DE SOPORTE PARA PODER EJE ACERO/PLASTICO,PAGO A CREDITO: 180 DIAS, CONTABILIZADO A PARTIR DE SU POSTEO EN EL | UNITED STATES | UNITED STATES | 306 |
| AEREA Y POSTAL EX-IAAC | 2024 | 1 | U | EMPAQUE DE RADIO, S/M, S/M PACKER, 6.0 R, XPT P/N: 100088859 INSTALA EN LA PROBETA DEL XPT PARA HACER SELLO EN LA FORMACION Y LOGRAR MEDIR LA PRESION E CAUCHO DE ALTA DUREZA PEGADO A UNA PLATINA DE ACERO ,PAGO A CREDITO:180 DIAS,CONTABILIZADO | UNITED STATES | COLOMBIA | 79.33 |
| AEREA Y POSTAL EX-IAAC | 2024 | 1 | U | KIT DE SELLOS, S/M, S/M HJ650, PACKING KIT P/N: H16615. KIT=UNIDAD USO EN EL EJE MODULADOR DE LOS ESTATORES PAGO A CREDITO 180 DIAS CONTABILIZADO A PARTIR DE SU FECHA DE POSTEO EN SAP: 04-12-24 | UNITED STATES | COLOMBIA | 733.67 |
| AEREA Y POSTAL EX-IAAC | 2024 | 4 | U | EMPAQUE, S/M, S/M GASKET,VALVE FELT 2 IN DR 20000 LB 1.3 ID P/N: 442152000, SUPPLIER PART NUMBER: 3235174 EQUIPOS DE CONTROL DE SOLIDOS EN FLUIDO DE PERFORACION DAT= DPU 2020, PAGO CREDITO 180 DIAS CONTAB. A PARTIR DE FECHA DE POSTEO EN SAP: 22-11-24 | UNITED STATES | UNITED STATES | 37.09 |
| AEREA Y POSTAL EX-IAAC | 2024 | 2 | U | EMPAQUE, S/M, S/M GASKET,VALVE FELT 2 IN DR 20000 LB 1.3 ID P/N: 442152000, SUPPLIER PART NUMBER: 3235174 EQUIPOS DE CONTROL DE SOLIDOS EN FLUIDO DE PERFORACION DAT=DPU 2020, PAGO CREDITO 180 DIAS CONTAB. A PARTIR DE FECHA DE POSTEO EN SAP: 11-11-24 | UNITED STATES | UNITED STATES | 18.33 |
| TUMBES | 2024 | 12 | U | GASKET: LEAD ALL EQUIPMENT ALL SERIES, S/M, S/M GASKET: LEAD ALL EQUIPMENT ALL SERIES P/N: 0023903 PARA LA INDUSTRIA PETROLERA PAGO A 30 DIAS | UNITED STATES | ECUADOR | 8.94 |