| AEREA Y POSTAL EX-IAAC | 2025 | 3.027 | KG | UNIDAD DE CABLE, FLYGT, S/M CONECTOR DE ENTRADA - CABLE UNIT 6505100 PARTE DE BOMBA VARIOS | SWEDEN | SWEDEN | 275.05 |
| AEREA Y POSTAL EX-IAAC | 2025 | 0.01 | KG | UNIDAD DE CABLE, FLYGT, S/M CONECTOR DE ENTRADA - CABLE UNIT 6505100 PARTE DE BOMBA ACERO | SWEDEN | SWEDEN | 250.03 |
| AEREA Y POSTAL EX-IAAC | 2025 | 0.001 | KG | UNIDAD DE CABLE, FLYGT, S/M CONECTOR DE ENTRADA - CABLE UNIT 6505100 PARTE DE BOMBA ACERO | SWEDEN | SWEDEN | 25 |
| AEREA Y POSTAL EX-IAAC | 2025 | 0.01 | KG | UNIDAD DE CABLE, FLYGT, S/M CABLE UNIT 6505100 PARTE DE BOMBA ACERO | SWEDEN | SWEDEN | 24.99 |
| AEREA Y POSTAL EX-IAAC | 2025 | 6.615 | KG | CABLE ELECTRICO SUMERGIBLE, FLYGT, S/M CABLE SUBCAB 4G1,5+2X1,5 942061 TRANSPORTAR LA ENERGÍA ELÉCTRICA COBRE | GERMANY | SWEDEN | 84.29 |
| AEREA Y POSTAL EX-IAAC | 2025 | 8.442 | KG | CABLE ELECTRICO SUMERGIBLE, FLYGT, S/M CABLE SUBCAB 4G2,5+2X1,5 942059 TRANSPORTAR LA ENERGÍA ELÉCTRICA COBRE | GERMANY | SWEDEN | 111.82 |
| AEREA Y POSTAL EX-IAAC | 2025 | 7.936 | KG | CABLE ELECTRICO SUMERGIBLE, FLYGT, S/M CABLE SUBCAB 7G2,5+2X1 942082 TRANSPORTAR LA ENERGIA ELECTRICA COBRE | GERMANY | SWEDEN | 128.48 |
| AEREA Y POSTAL EX-IAAC | 2025 | 54.6 | KG | CABLE ELECTRICO SUMERGIBLE, FLYGT, S/M CABLE SUBCAB 4G16 + S(2X0.5) (REEMPLAZA A 942058) 941982 TRANSPORTAR LA ENERGÍA ELÉCTRICA COBRE,50 DÍAS DESPUÉS DEL FINAL DEL MES DE ENVÍO | GERMANY | SWEDEN | 978.74 |
| AEREA Y POSTAL EX-IAAC | 2025 | 54.6 | KG | CABLE ELECTRICO SUMERGIBLE, FLYGT, S/M CABLE SUBCAB 4G16 + S(2X0.5) (REEMPLAZA A 942058) 941982 TRANSPORTAR LA ENERGÍA ELÉCTRICA COBRE | GERMANY | SWEDEN | 978.74 |
| AEREA Y POSTAL EX-IAAC | 2025 | 990 | KG | CABLE ELECTRICO SUMERGIBLE, FLYGT, S/M CABLE SUBCAB 3X70+2G35/2+S(2X0.5) 941986 TRANSPORTAR LA ENERGÍA ELÉCTRICA COBRE | GERMANY | SWEDEN | 19104.8 |
| AEREA Y POSTAL EX-IAAC | 2025 | 8.442 | KG | CABLE ELECTRICO SUMERGIBLE, FLYGT, S/M CABLE SUBCAB 4G2,5+2X1,5 942059 TRANSPORTAR LA ENERGIA ELECTRICA COBRE,CREDIT 50 DIAS FINALIZANDO MES DE ENVIO DESDE LAS INSTALACIONES DE XYLEM | GERMANY | SWEDEN | 111.91 |
| AEREA Y POSTAL EX-IAAC | 2025 | 26.88 | KG | CABLE ELECTRICO SUMERGIBLE, SUBCAB, S/M CABLE SUBCAB 7X1,5 MM2 941922 TRANSPORTAR LA ENERGÍA ELÉCTRICA COBRE - 1.01 , U$ 500 ES UN COBRO POR SERVICIO DE MANIPULEO DEL ITEM 1,PAGO 50 DÍAS DESPUÉ | GERMANY | SWEDEN | 838.92 |