| TUMBES | 2024 | 8 | U | BRG HSG: S/A, J12000N, 1.18, ARZ-T, NI, S/M, S/M BRG HSG: S/A, J12000N, 1.18, ARZ-T, NI P/N: 101569733 PARA LA INDUSTRIA PETROLERA PAGO A 30 DIAS | SINGAPORE | ECUADOR | 2642.55 |
| TUMBES | 2024 | 2 | U | SPACER: THRUST BRG, PROT 540, STD, 4.5O, S/M, S/M SPACER: THRUST BRG, PROT 540, STD, 4.5O P/N: 0386854 PARA LA INDUSTRIA PETROLERA PAGO A 30 DIAS | SINGAPORE | ECUADOR | 71 |
| TUMBES | 2024 | 12 | U | SHIM: RTR, MTR 540, 562 , .010, BRASS, S/M, S/M SHIM: RTR, MTR 540, 562 , .010, BRASS P/N: 0114900 PARA LA INDUSTRIA PETROLERA PAGO A 30 DIAS | SINGAPORE | ECUADOR | 3.67 |
| AEREA Y POSTAL EX-IAAC | 2024 | 2 | U | COPLE PARA UNION DE EJES, S/M, S/M COUPLING: S/A, 1.19-6B SPL TO 1.37 INVO P/N: 1067636 UNE LOS EJES DE 1.19" DEL PROTECTOR CON EL EJE INVOLUTE DEL MOTOR MONEL | SINGAPORE | COLOMBIA | 388.39 |
| AEREA Y POSTAL EX-IAAC | 2024 | 1 | U | ANILLO DE 2 PIEZAS, S/M, S/M RING: TWO PIECE, 1.18, SSM 540, INC 718 P/N: 101409015, SET=UNIDAD SOSTENER EL CONJUNTO DE QUE SOPORTA LA CARGA AXIAL GENERADA POR LA BOMBAS ESP ALEACION 718 | SINGAPORE | COLOMBIA | 105.61 |
| AEREA Y POSTAL EX-IAAC | 2024 | 1 | U | ANILLO DE RETENCION, S/M, S/M COLLAR, RING: TWO PIECE, 1.18, SSM 540 P/N: 101409020 SOSTENER EL CONUNTO DE QUE SOPORTA LA CARGA AXIAL GENERADA POR LAS BOMBAS ESP ALEACION 718 | SINGAPORE | COLOMBIA | 60.93 |
| TUMBES | 2024 | 6 | U | HOUSING: PROT, 540 RLOY, MODULAR, S/M, S/M HOUSING: PROT, 540 RLOY, MODULAR P/N: 1069780 PARA USO EN LA INDUSTRIA PETROLERA | SINGAPORE | ECUADOR | 3832.87 |
| TUMBES | 2024 | 2 | U | RING: LOCK, PROT 540 CS, 1.18 MODULAR, S/M, S/M RING: LOCK, PROT 540 CS, 1.18 MODULAR P/N: 1130509 PARA USO EN LA INDUSTRIA PETROLERA | SINGAPORE | ECUADOR | 113.16 |
| MARITIMA DEL CALLAO | 2024 | 2 | U | LAINA, S/M, S/M SHIM: PMP SFT SETTING, .015 .87 302SS P/N: 7019615, PARA BOMBA ELECTROSUMERGIBLE | SINGAPORE | COLOMBIA | 3.17 |
| TUMBES | 2024 | 3 | U | RING, COMPRESSION: 540 MTR, PLUG-IN, TI, S/M, S/M RING, COMPRESSION: 540 MTR, PLUG-IN, TI P/N: 7026164 PARA USO EN LA INDUSTRIA PETROLERA | SINGAPORE | ECUADOR | 15.74 |
| TUMBES | 2024 | 1 | U | BASE: PROT 540, S/A, S/M, S/M BASE: PROT 540, S/A, 1.18, BOLT-ON, RLO P/N: 100263005 PARA LA INDUSTRIA PETROLERA PLAZO: 30 DÍAS DESDE LA FECHA DE FACTURA | SINGAPORE | ECUADOR | 413.26 |
| TUMBES | 2024 | 1 | U | HEAD: PMP, 675 S/A RLOY BTHD, 1.18 C-CT, S/M, S/M HEAD: PMP, 675 S/A RLOY BTHD, 1.18 C-CT P/N:100988154 PARA LA INDUSTRIA PETROLERA PLAZO: 180 DÍAS DESDE LA FECHA DE FACTURA | SINGAPORE | ECUADOR | 986.6 |