| AEREA Y POSTAL EX-IAAC | 2024 | 2 | U | ANILLO DE CIERRE, S/M, S/M RING: LOCK, PROT 540 CS, 1.18 MODULAR P/N: 1130509 PARA ROTOR MODULAR DE BOMBA ELECTROSUMERGIBLE PAGO A CREDITO 180 DIAS CONTABILIZADO A PARTIR DE LA FECHA DE SU POSTEO EN SAP: 18-06-24 | SINGAPORE | COLOMBIA | 77.36 |
| AEREA Y POSTAL EX-IAAC | 2024 | 3 | U | ANILLO, S/M, S/M RING, COMPRESSION: 540 MTR PLUG-IN, TI P/N: 7026164 PARA USO EN LA INDUSTRIA PETROLERA PAGO A CREDITO 180 DIAS CONTABILIZADO A PARTIR DE LA FECHA DE SU POSTEO EN SAP: 18-06-24 | SINGAPORE | COLOMBIA | 10.3 |
| TUMBES | 2024 | 2 | U | HOUSING: THRUST BRG, PROT 540, BOLT-ON,, S/M, S/M HOUSING: THRUST BRG, PROT 540, BOLT-ON, P/N: 100265961 PARA LA INDUSTRIA PETROLERA PLAZO: 180 DÍAS DESDE LA FECHA DE FACTURA | SINGAPORE | ECUADOR | 614.81 |
| TUMBES | 2024 | 1 | U | BASE: PMP, 675 S/A RLOY BTHD, 1.18 C-CT, S/M, S/M BASE: PMP, 675 S/A RLOY BTHD, 1.18 C-CT P/N: 100988142 PARA LA INDUSTRIA PETROLERA PLAZO: 180 DÍAS DESDE LA FECHA DE FACTURA | SINGAPORE | ECUADOR | 1157.55 |
| AEREA Y POSTAL EX-IAAC | 2024 | 3 | U | BASE, S/M, S/M BASE: PROT 540, S/A, 1.18, BOLT- ON, RLO P/N: 100263005 PARA PROTECTOR EN BOMBAS ELECTROSUMERGIBLES PAGO A CREDITO 180 DIAS CONTABILIZADOS A PARTIR DE SU FECHA DE POSTEO EN SAP 20/11/24 | SINGAPORE | COLOMBIA | 1739.51 |
| AEREA Y POSTAL EX-IAAC | 2024 | 10 | U | ESTRUCTURA , S/M, S/M BAG FRAME: PROT 540, S/A, RLOY MODULA P/N: 1069772 PARA ALOJAMIENTO DE BOMBA ELECTROSUMERGIBLE PAGO A CREDITO 180 DIAS CONTABILIZADOS A PARTIR DE SU FECHA DE POSTEO EN SAP 20/11/24 | SINGAPORE | COLOMBIA | 3952.87 |
| AEREA Y POSTAL EX-IAAC | 2024 | 2 | U | ADAPTADOR, S/M, S/M ADAPTER: FLUID DIRECTOR, PMP 675, 1.18 P/N: 1197409 PARA BOMBA ELECTROSUMERGIBLE | SINGAPORE | COLOMBIA | 141.67 |
| AEREA Y POSTAL EX-IAAC | 2024 | 1 | U | LAINA, S/M, S/M SHIM: PMP HSG, .030 6.75 OD, 6.39 ID, M P/N: 7006828 PARA BOMBA ELECTROSUMERGIBLE | SINGAPORE | COLOMBIA | 7.73 |
| AEREA Y POSTAL EX-IAAC | 2024 | 4 | U | ANILLO, S/M, S/M RING, COMPRESSION: 540 MTR, PLUG-IN, TI P/N: 7026164 PARA USO EN LA INDUSTRIA PETROLERA | SINGAPORE | COLOMBIA | 12.45 |
| AEREA Y POSTAL EX-IAAC | 2024 | 4 | U | TAPA DE COMPENSACION, S/M, S/M CAP: COMPENSATING SHIPPING, S/A, PROT 5 P/N: 101389058 PARA USO EN BOMBA ELECTROSUMERGIBLES PAGO A CREDITO: 180 DIAS CONTABILIZADO A PARTIR DE LA FECHA DE SU POSTEO EN SAP: 19/09/24 | SINGAPORE | CANADA | 1528.96 |
| TUMBES | 2024 | 2 | U | BASE, S/M, S/M BASE: PMP, 675 S/A RLOY BTHD, 1.18 C-CT P/N: 100988142 PARA USO EN LA INDUSTRIA PETROLERA PAGO A 180 DAS DE LA FECHA DE FACTURA | SINGAPORE | ECUADOR | 2172.28 |
| TUMBES | 2024 | 4 | U | TUBO PARA EJE, S/M, S/M TUBE: SHAFT, PROT 540, RLOY MODULAR P/N: 1069798 PARA LA INDUSTRIA PETROLERA PLAZO: 180 DÍAS DESDE LA FECHA DE FACTURA | SINGAPORE | ECUADOR | 1177.64 |